Minimizing Running Costs in Consumption Systems

نویسندگان

  • Tomás Brázdil
  • David Klaska
  • Antonín Kucera
  • Petr Novotný
چکیده

A standard approach to optimizing long-run running costs of discrete systems is based on minimizing the mean-payoff, i.e., the long-run average amount of resources (“energy”) consumed per transition. However, this approach inherently assumes that the energy source has an unbounded capacity, which is not always realistic. For example, an autonomous robotic device has a battery of finite capacity that has to be recharged periodically, and the total amount of energy consumed between two successive charging cycles is bounded by the capacity. Hence, a controller minimizing the mean-payoff must obey this restriction. In this paper we study the controller synthesis problem for consumption systems with a finite battery capacity, where the task of the controller is to minimize the mean-payoff while preserving the functionality of the system encoded by a given linear-time property. We show that an optimal controller always exists, and it may either need only finite memory or require infinite memory (it is decidable in polynomial time which of the two cases holds). Further, we show how to compute an effective description of an optimal controller in polynomial time. Finally, we consider the limit values achievable by larger and larger battery capacity, show that these values are computable in polynomial time, and we also analyze the corresponding rate of convergence. To the best of our knowledge, these are the first results about optimizing the long-run running costs in systems with bounded energy stores.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ارائه الگویی جهت محاسبه هزینه اجتماعی نهایی کوتاه مدت تولید برق در نیروگاه های حرارتی مطالعه موردی نیروگاه‌های شهید محمد منتظری و اسلام آباد اصفهان

  The aim of this study is to calculate the marginal private and social costs of two thermal power plants in Isfahan region for a particular day in January 2010. For this purpose a nonlinear planning model with linear constraints has been used. The objective function (social cost) which is a twofold objective function is calculated by the summation of variable costs and external costs of power ...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

Particle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system

This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...

متن کامل

A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem

This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...

متن کامل

Balancing electricity bill and performance in server farms with setup costs

High electricity consumption, associated with running Internet scale server farms, not only reflects on the data center’s greenhouse gas emissions, but also increases the cost of running the data center itself. In this paper, we consider the problem of maximizing the revenues of service providers running large scale data centers subject to setup cost by reducing their electricity bill, while co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014