The paper investigates a stochastic production scheduling problem with unrelated parallel machines. A closed-loop scheduling technique is presented that on-line controls the production process. To achieve this, the scheduling problem is reformulated as a special Markov Decision Process. A near-optimal control policy of the resulted MDP is calculated in a homogeneous multi-agent system. Each agent applies a trial-based approximate dynamic programming method. Different cooperation techniques to distribute the value function computation among the agents are described. Finally, some benchmark experimental results
منابع مشابه
Agent-based approach for cooperative scheduling
This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...
متن کاملUsing Multi-Agent System for Dynamic Job Shop Scheduling
Today’s industries need more flexible scheduling systems able to produce new valid schedule in response to the modifications concerning orders, production processes and deliveries of materials. This paper introduces a multi-agent system applied to a job shop dynamic scheduling problem in which new production orders or deliveries arrive continuously and affect the already scheduled plan. We have...
متن کاملUsing Multi-agent System for Dynamic Job Shop Scheduling1
Today’s industries need more flexible scheduling systems able to produce new valid schedule in response to the modifications concerning orders, production processes and deliveries of materials. This paper introduces a multi-agent system applied to a job shop dynamic scheduling problem in which new production orders or deliveries arrive continuously and affect the already scheduled plan. We have...
متن کاملStochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation
This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...
متن کاملOPTIMIZATION OF A PRODUCTION LOT SIZING PROBLEM WITH QUANTITY DISCOUNT
Dynamic lot sizing problem is one of the significant problem in industrial units and it has been considered by many researchers. Considering the quantity discount in purchasing cost is one of the important and practical assumptions in the field of inventory control models and it has been less focused in terms of stochastic version of dynamic lot sizing problem. In this paper, stochastic dyn...