TESLA Test Facility Control System and its Current Status
نویسندگان
چکیده
The TESLA Test Facility (TTF) linear accelerator for electrons is under construction at DESY [1]. It is based on the use of accelerating modules consisting of eight nine-cell superconducting cavities. About one year this linac (more than 100 meters in length) operated with one cryomodule and produced 125 MeV electrons. This period was intensively used by the control system developers to test, create and improve control software.
منابع مشابه
Bunch Compressor Ii at the Tesla Test Facility
In the TESLA Test Facility (TTF), short bunches with low emittance are needed for the operation of a free electron laser. Several stages of bunch compression by means of magnetic chicanes will be used to reach the required peak current. The second stage of the bunch compression system, bunch compressor II, has been taken into operation recently. We describe design and instrumentation of the bun...
متن کاملTest Facilities for Future Linear Colliders
For many years now there has been active research around the world towards a future linear collider with an energy of about 1 TeV. This research has led to several test facilities around the world that seek to test key aspects of the various approaches. A comparison of the approaches to the design is given in these proceedings [1]. The purpose of this paper is to review the status of the test f...
متن کاملThe Vacuum System for the Superconducting Linac of the TESLA Test Facility
Among the different approaches towards a next generation 500 GeV e+elinear collider the TESLA design uses superconducting accelerating structures operating at 1.3 GHz with a gradient of 25 MV/m. Presently the TESLA Test Facility, which includes a prototype linear accelerator with superconducting cavities, is build up at DESY/Hamburg to serve as an R&D tool. First electrons have been accelerated...
متن کاملOutsourcing Evaluation of Operational Supervision of Participation Facility in Maskan Bank and Investigation of Possible Practices Using AHP Method
This article aims to find out the best outsourcing practice for operational supervision process of participation facility in Maskan Bank. In the preliminary study, it was found that the bank has not achieved the expected outsourcing benefits and has seriously risked losing control over the supervision process and overdependence on the supplier. As a part of this study, the Bank objectivrs of ou...
متن کاملTesla Test Facility Stripline Readout System
The elaboration of the signals provided by the fourstripline Beam Position Monitors (BPM) on the superconducting linac TTF will be accomplished by parallel rf circuits, giving a signal of ~1 V /cm, indipendent of beam current, for both horizontal and vertical beam positions with time response ~1μs. and useful range > ±1 cm The performances with respect to thermal drifts and input dynamics are p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2005