A four-day workweek days-off scheduling problem is considered. Out of the three days off per week for each employee, either two or three days must be consecutive. An optimization algorithm is presented which starts by utilizing the problem’s special structure to determine the minimum workforce size. Subsequently, workers are assigned to different days-off work patterns in order to minimize either the total number or the total cost of the workforce. Different procedures must be followed in assigning days-off patterns, depending on the characteristics of labor demands. In some cases, optimum days-off assignments are determined without requiring mathematical programming. In other cases, a workforce size constraint is added to the integer programming model, greatly improving computational performance. Mathematics Subject Classifications (2000): 90B35, 90C10.
منابع مشابه
Maintenance Staff Scheduling at Afam Power Station
This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek sched...
متن کاملA dynamic programming algorithm for days-off scheduling with sequence dependent labor costs
This paper presents a dynamic programming (DP) algorithm for solving a labor scheduling problem with several realistic days-off scheduling constraints and a cost structure that depends on the work sequence for each employee. The days-off scheduling constraints include the following: (1) each employee is assigned no more than three workdays per week, (2) each employee is assigned at least two co...
متن کاملThe effect of twelve-hour shift working on absence attributed to sickness.
In a review of the medical and social aspects of shift work Taylor (1970) points out that many of the most important questions relating to shift work remain to be answered. One of these questions, on which evidence to date has been almost nonexistent, is the effect of a twelve-hour shift system on absence attributed to sickness. An opportunity to examine this occurred in 1973 when a change was ...
متن کاملA case study
This paper describes an actual aircraft maintenance labor scheduling study. The study's objective is to determine the optimum maintenance workforce schedule to satisfy growing labor requirements with minimum cost. The main recommendation of the study is to switch from a five-day to a seven-day workweek for aircraft maintenance workers. A new integer programming formulation, used to obtain an op...
متن کاملOptimum workforce scheduling under the (14, 21) days-off timetable
An efficient optimum solution is presented for a real-life employee daysoff scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Math. Model. Algorithms
دوره 2 شماره
صفحات -
تاریخ انتشار 2003