Record keeping for contemporaneous delay analysis: a model for effective event management
نویسندگان
چکیده
Increasingly sophisticated computer software is being utilized to support detailed critical path method (CPM) analysis for resolving delay and disruption claims. The accurate determination of entitlement is however still dependent on the quality of programme and progress information provided by all parties. A comparative analysis of record-keeping methods in the UK and the US reveals that there is less rigour to this practice in the UK, where parties are not required by the contract to provide such records. In most forms of US government construction contract the contractor is required to produce a schedule using CPM software and to regularly update this to reflect project progress and changes. Recent recommended best practice in the UK also stipulates that the contractor should keep reliable and accurate progress and programme records to assist contemporaneous assessment of the cause and effect of project changes. While not contractually imperative, a clear method of managing information is important in UK construction and engineering projects to facilitate more effective and accurate assessments of delay and disruption. The US experience and good practice approaches in the UK demonstrate the importance of implementing and establishing an ‘event management strategy and archive’ at the outset of projects.
منابع مشابه
Designing a model for holding mega sport events with an emphasis on national brand development
The present study seeks a model for holding major sporting events with an emphasis on national brand development. The research method is a mixture of qualitative and quantitative. In the quantitative part, the statistical population, including professors and sports activists, and the statistical sample was done by stratified random sampling. Adequate number for modeling in pls software was 300 ...
متن کاملTopic #8: Personal Exposure Characteristics Synopsis
RAPID Engineering Project #4 (Bracken et al., 1997a) summarized past efforts and developed guidelines for contemporaneous PE monitoring. Guidelines for PE study design provide recommendations for selecting the field characteristics to be measured; selecting appropriate instrumentation; developing a sampling strategy; establishing time-activity record-keeping protocols; and developing plans for ...
متن کاملConstrained Controller Design for Real-time Delay Recovery in Metro Systems
This study is concerned with the real-time delay recovery problem in metro loop lines. Metro is the backbone of public transportation system in large cities. A discrete event model for traffic system of metro loop lines is derived and presented. Two effective automatic controllers, linear quadratic regulator (LQR) and model predictive controller (MPC), are used to recover train delays. A newly-...
متن کاملA Two-warehouse Inventory Model for Deteriorating Items with Permissible Delay under Exponentially Increasing Demand
In this study, a two-warehouse inventory model with exponentially increasing trend in demand involving different deterioration rates under permissible delay in payment has been studied. Here the scheduling period is assumed to be a variable. The objective of this study is to obtain the condition when to rent a warehouse and the retailer's optimal replenishment policy that minimizes the total re...
متن کاملمدیریت بحران در بخش مدارک پزشکی بیمارستان های آموزشی استان کرمان و شهرستان بروجرد- 1385 :
Introduction: Disaster medicine and crisis management can reduce the effects and hazards of disasters. In addition to, new technologies health information management which enters, collects, saves, retrieves and analyzes necessary information and makes it accessible to managers and planners. To review crisis management in medical record in teaching hospitals in Kerman Province and Brujerd city a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2006