Profit based unit commitment for GENCOs using parallel NACO in a distributed cluster

نویسندگان

  • C. Christopher Columbus
  • Sishaj P. Simon
چکیده

Deregulation process has created an intense competition with the participation of many generating companies (GENCOs) in a power market. Wholesale transactions (bids and offer) have to be cleared and settled in a shorter duration. Therefore, this necessitates for the system operator to quick and smarter decisions. In this problem formulation, profit based unit commitment (PBUC) problem aims in maximizing the profit of GENCOs. However demand satisfaction is not an obligation. Here, parallel nodal ant colony optimization (PNACO) approach mimicking ant’s intelligence is used in the decision on committing generating units. The sub problem economic dispatch (ED) is carried out using parallel artificial bee colony (PABC) approach mimicking foraging behavior of bees. Profit based unit commitment (PBUC) must be obtained in less time even though there is a possible increase in generating units. Nowadays, as computing resources are available in plenty, effective utilization will be advantageous for reducing the time complexity for a large scale power system solution. The proposed approach uses a cluster of computers performing parallel operations in a distributed environment for obtaining the PBUC solution. The time complexity and the solution quality with respect to the number of processors in the cluster are thoroughly investigated. The effectiveness of the proposed approach for PBUC is first validated on a standard 10 unit system available in the literature and then analysis for computational efficiency using 1000 generating units, which is a duplicate form of standard 10 unit system. & 2013 Elsevier B.V. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Profit based unit commitment for GENCOs using Parallel PSO in a distributed cluster

In the deregulated electricity market, each generating company has to maximize its own profit by committing suitable generation schedule termed as profit based unit commitment (PBUC). This article proposes a Parallel Particle Swarm Optimization (PPSO) solution to the PBUC problem. This method has better convergence characteristics in obtaining optimum solution. The proposed approach uses a clus...

متن کامل

Short-term Price-based Unit Commitment of Hydrothermal GenCos: A Pre-emptive Goal Programming Approach

The solution of single-objective unit commitment problems for generation companies participating in deregulated markets may not directly be implementable mainly because of neglecting some conflicting secondary objectives arising from policy-making at internal/external environment. Benefiting an efficient multi-objective approach to improve the applicability of price-based unit commitment soluti...

متن کامل

IEEE Paper Template in A4 (V1)

In this paper, Genetic Algorithm is used to solve the profit based unit commitment for deregulated power system in order to achieve optimal generation schedule and maximum profit of GENCOS. Deregulation of power system means unbundling of vertically integrated power system into generation, transmission and distribution companies. This proposed algorithm or approach is tested on IEEE-30 bus syst...

متن کامل

A Simple Approach for Optimal Generation Scheduling to Maximize GENCOs Profit Using PPD Table and ABC Algorithm under Deregulated Environment

Received Feb 8, 2013 Revised Aug 1, 2013 Accepted Aug 18, 2013 In this paper an attempt has been made to solve the profit based unit commitment problem (PBUC) using pre-prepared power demand (PPD) table with an artificial bee colony (ABC) algorithm. The PPD-ABC algorithm appears to be a robust and reliable optimization algorithm for the solution of PBUC problem. In a deregulated environment, ge...

متن کامل

A Novel LR-QPSO Algorithm for Profit Maximization of GENCOs in Deregulated Power System

The electric power industry need changes in various power system operation, control and planning activities. Generation companies (GENCOs) schedule their generators with an objective to maximize their own profit rather than compromising on social benefit. Power and reserve prices become important factors in decision process. GENCOs decision to commit generating units is associated with financia...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Swarm and Evolutionary Computation

دوره 10  شماره 

صفحات  -

تاریخ انتشار 2013