COCOMO Estimates Using Neural Networks

نویسندگان

  • Anupama Kaushik
  • Ashish Chauhan
  • Deepak Mittal
  • Sachin Gupta
چکیده

Software cost estimation is an important phase in software development. It predicts the amount of effort and development time required to build a software system. It is one of the most critical tasks and an accurate estimate provides a strong base to the development procedure. In this paper, the most widely used software cost estimation model, the Constructive Cost Model (COCOMO) is discussed. The model is implemented with the help of artificial neural networks and trained using the perceptron learning algorithm. The COCOMO dataset is used to train and to test the network. The test results from the trained neural network are compared with that of the COCOMO model. The aim of our research is to enhance the estimation accuracy of the COCOMO model by introducing the artificial neural networks to it.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Proposing a Novel Artificial Neural Network Prediction Model to Improve the Precision of Software Effort Estimation

Nowadays, software companies have to mange different software development processes based on different time, cost, and number of staff sequentially, which is a very complex task and supports project planning and tracking. Software time, cost and manpower estimation for separate projects is one of the critical and crucial tasks for project managers. Accurate software estimation at an early stage...

متن کامل

Neural network based model for productivity in software development

This paper looks into productivity of 634 software projects completed between 2009 and 2013 within the IT department of the Dutch tax administration. A predictive neural network based model is developed in order to produce better estimates for future development efforts. Direct cost drivers and numerous organizational changes are identified in order to analyze their impact on productivity. The ...

متن کامل

Prediction of Software Development Effort Using RBNN and GRNN

Software development effort prediction is one of the most key activities in software industry. Many models have been proposed to build a relationship between software size and effort; however we still have problems for effort prediction. This is because project data, available in the primary stages of project is often inadequate, unpredictable, uncertain and unclear. The need for accurate effor...

متن کامل

A Simple Neural Network Approach to Software Cost Estimation

The effort invested in a software project is one of the most challenging task and most analyzed variables in recent years in the process of project management. Software cost estimation predicts the amount of effort and development time required to build a software system. It is one of the most critical tasks and it helps the software industries to effectively manage their software development p...

متن کامل

A Concise Neural Network Model for Estimating Software Effort

In this research, it is concerned with constructing software effort estimation model based on artificial neural networks. The model is designed accordingly to improve the performance of the network that suits to the COCOMO model. In this paper, it is proposed to use multi layer feed forward neural network to accommodate the model and its parameters to estimate software development effort. The n...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012