Integrated model for line balancing with workstation inventory management

نویسنده

  • Dilip Roy
چکیده

Article history: Received 13 May 2010 Received in revised form 14 May 2010 Accepted 14 May 2010 Available online 15 May 2010 In this paper, we address the optimization of an integrated line balancing process with workstation inventory management. While doing so, we have studied the interconnection between line balancing and its conversion process. Almost each and every moderate to large manufacturing industry depends on a long and integrated supply chain, consisting of inbound logistic, conversion process and outbound logistic. In this sense an approach addresses a very general problem of integrated line balancing. Research works reported in the literature so far mainly deals with minimization of cost for inbound and outbound logistic subsystems. In most of the cases conversion process has been ignored. We suggest a generic approach for linking the balancing of the line of production in the conversion area with the customers’ rate of demand in the market and for configuring the related stock chambers. Thus, the main aim of this paper is to translate the underlying problem in the form of mixed nonlinear programming problem and design the optimum supply chain so that the total inventory cost and the cost of balancing loss of the conversion process is jointly minimized and ideal cycle time of the production process is determined along with ideal sizes of the stock chambers. A numerical example has been added to demonstrate the suitability of our approach. © 2010 Growing Science Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect

Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...

متن کامل

Assembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations

This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...

متن کامل

Multi-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization

Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...

متن کامل

Facility Location and Inventory Balancing in a Multi-period Multi-echelon Multi-objective Supply Chain: An MOEA Approach

A comprehensive and integrated study of any supply chain (SC) environment is a vital requirement that can create various advantages for the SC owners. This consideration causes productive managing of the SC through its whole wide components from upstream suppliers to downstream retailers and customers.  On this issue, despite many valuable studies reported in the current literature, considerabl...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010