Inventory control of service parts in the final phase

نویسندگان

  • Ruud H. Teunter
  • Willem K. Klein Haneveld
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints

Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints, Reliability Engineering and System Safety, This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of ...

متن کامل

روش جدید کنترل کارت از طریق ترکیب سیاستهای کنترل تولید

  One of the efforts in a pull system to meet the final goal of Just-In-Time is reducing Work-In-Process (WIP) without reducing throughput rate an service level. This paper proposes a new hybird control policy using extended Kanban, Generalized Kanban and CONWIP to form the final construction of production plan. Simulation of a 3-stage case study with probabilistic parameters showed the reducti...

متن کامل

Spare Parts Inventory Control for Non-Repairable Items Based on Prognostics and Health Monitoring Information - FINAL

The application of PHM (Prognostics and Health Monitoring) techniques can provide a wide range of benefits to aircraft operators. Since the primary goal of PHM systems is to estimate the health state of components and equipments, as well as forecasting their RUL (Remaining Useful Life), they are often closely associated with the reduction in the number of unscheduled maintenance tasks. Indeed, ...

متن کامل

Closed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition

In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...

متن کامل

Linear integrated location-inventory models for service parts logistics network design

We present two integrated network design and inventory control problems in service-parts logistics systems. Such models are complicated due to demand uncertainty and highly nonlinear time-based service level constraints. Exploiting unique properties of the nonlinear constraints, we provide an equivalent linear formulation under part-warehouse service requirements, and an approximate linear form...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 138  شماره 

صفحات  -

تاریخ انتشار 2002