Comparing models for lot-sizing and scheduling of single-stage continuous processes: Operations research and process systems engineering approaches

نویسندگان

  • Pedro Amorim
  • Tânia Pinto
  • Bernardo Almada-Lobo
  • Ana Paula F. D. Barbosa-Póvoa
چکیده

In the last years, several researchers from two different academic communities, the Operations Research and the Process Systems Engineering, have been developing mathematical formulations for the lot-sizing and scheduling of single-stage continuous processes with complex setup structures. This problem has been intensively studied due to its importance to a wide range of industries where a single-stage approach is suitable for production planning. This is the case of the glass container, beer, and dairy production. Recent works have been performed by both mentioned communities, however, no intense communication between these research efforts has been observed. This work attempts a systematic analysis on recent formulation developments of both communities. Based on the result of this comparison, a reformulation is proposed that outperforms in the majority of the cases the previous existent formulations for a set of systematically generated random instances. © 2013 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

Lot sizing with rework and different inspection costs

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & Chemical Engineering

دوره 52  شماره 

صفحات  -

تاریخ انتشار 2013