A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
نویسنده
چکیده
A flexible manufacturing system (FMS) is an integrated system of computer numerically controlled (CNC) machine tools, each having an automatic tool interchange capability, and all connected by an automated material handling system. One or more computers control most real-time functions. Flexible manufacturing is realized to be an efficient alternative to conventional manufacturing that allows simultaneous machining of small to medium batches of a variety of part types. Parts can flow through the system in unit batch sizes. These systems typically machine five to forty different part types. In managing these systems, technological requirements indicate that several decisions must be made prior to system start-up. With these requirements in mind, previous research has defined a set of production planning problems, providing a conceptual framework to aid an FMS manager in setting up h is /her system to enable efficient production. Several approaches have been taken to solve several of these problems and we describe those here. The main focus in this paper is on only two of these planning problems, the machine grouping and loading problems. In brief, the FMS machine grouping problem is to partition the m i machine tools of type i into g, groups to maximize expected production, subject to FMS technological and capacity constraints. Machines in a group are identically tooled and hence can perform the same operations during production. The FMS loading problem is to allocate operations and associated tooling of a selected set of part types among the machine groups, according to some appropriate (system dependent) loading objective, also subject to technological and capacity constraints. This paper ties some previous results together by suggesting a hierarchical approach to solve actual grouping and loading problems. Both problems are first defined at an aggregated level of detail and in the context of a queueing network model. At this level, much information is suppressed. However, the robustness of the model allows the application of the obtained theoretical results to a lower level in the hierarchy that considers all details of these problems. In addition, results obtained using the aggregate model can be used as input to the detailed models. Here, the grouping and loading problems are formulated in all detail as nonlinear integer programs, using all available and required information. The use of these models to solve realistic machine grouping and loading problems is then described. Finally, future research needs are suggested.
منابع مشابه
A hybrid algorithm optimization approach for machine loading problem in flexible manufacturing system
The production planning problem of flexible manufacturing system (FMS) concerns with decisions that have to be made before an FMS begins to produce parts according to a given production plan during an upcoming planning horizon. The main aspect of production planning deals with machine loading problem in which selection of a subset of jobs to be manufactured and assignment of their operations to...
متن کاملAn Iterative Approach to System Setup Problems in Flexible Manufacturing Systems
System setup problems in flexible manufacturing systems deal with short-term planning problems such as part type selection, machine grouping, operation assignment, tooling, fixture and pallet allocation, and routing. In this article, we consider three of the subproblems: part type selection, machine grouping, and loading. We suggest a heuristic approach to solve the subproblems consistently wit...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملPerformance Prediction of a Flexible Manufacturing System
The present investigation presents a stochastic model for a flexible manufacturing system consisting of flexible machine, loading/unloading robot and an automated pallethandling device. We consider unreliable flexible manufacturing cell (FMC) wherein machine and robot operate under individual as well as common cause random failures. The pallethandling system is completely reliable. The pallet o...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003