Concurrent Crashing and Overlapping in Product Development
نویسندگان
چکیده
This research addresses two common tools for reducing product development lead times: overlapping of development stages and crashing of development times. For the first time in the product development literature, a formal model addresses both tools concurrently, thus facilitating analysis of the interdependencies between overlapping and crashing. The results exhibit the necessity of addressing overlapping and crashing concurrently, and exhibit general characteristics of optimal overlapping/crashing policies. The impact of different evolution/sensitivity constellations on optimal policies is investigated, and comprehensive guidelines for structuring development processes are provided. For the special case of linear costs, an efficient procedure is presented that generates the efficient time-cost trade-off curves and determines the corresponding optimal overlapping/crashing policies. The impact of key parameters and the robustness regarding their estimates is illustrated with a simple two-stage example.
منابع مشابه
Performance of Coupled Product Development Activities with a Deadline
This paper explores the performance of coupled development activities by proposing a performance generation model (PGM). The goal of the PGM is to develop insights about optimal strategies (i.e., sequential, concurrent, or overlapped) to manage coupled design activities that share a fixed amount of engineering resources subject to performance and deadline constraints. Model analysis characteriz...
متن کاملA Fuzzy Simulated Annealing approach for project time-cost tradeoff
Managers often face difficulties when making project decisions that involve large number of interrelated activities – the planning and scheduling of which is project management. Most problems often arise in areas such as product development, production planning and control and setting up the production facilities. One important aspect of project management is activity crashing, i.e. reducing th...
متن کاملConcurrent engineering performance: Incremental versus radical innovation
This article analyzes the link between the use of concurrent engineering (CE) and success in new product development (NPD) under varying conditions of uncertainty and complexity—radical versus incremental innovations. Using linear regression, the results obtained indicate that overlapping activities, inter-functional integration and teamwork positively affect NPD performance in terms of develop...
متن کاملComplex Concurrent Engineering and the Design Structure Matrix Method
Concurrent engineering (CE) principles have considerably matured over the last decade. However, many companies still face enormous challenges when implementing and managing CE practices. This is due to the increased complexity of engineering products and processes, on one hand, and the lack of corresponding CE models and tools, on the other hand. This paper focuses on four critical problems tha...
متن کاملSupply Chain Coordination through Lead Time Crashing in a Socially Responsible Supply Chain Considering Transportation Modes and Carbon Emissions Tax
In this paper, a socially responsible supply chain consisting of one supplier and one retailer is proposed. The supplier decides on replenishment cycle multiplier and the retailer invests in corporate social responsibility (CSR) and decides on the order-up-to-level under a periodic review replenishment policy. The retailer’s decisions impact on the supplier’s probability as well as the supply c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Operations Research
دوره 52 شماره
صفحات -
تاریخ انتشار 2004