Investment with Government Subsidies and Cost Contingency : The Case of Build - Operate - Transfer ( BOT ) Toll Road 1

نویسندگان

  • Phuong Doan
  • Kanak Patel
چکیده

Investment in toll road normally involves a portfolio of real options. We model a portfolio of real options with cost contingency and government subsidy at the operation stage. We demonstrate that the investment value is highly sensitive to cost and revenue uncertainties. Our numerical example suggests that the investment value of risky project is higher when net income guarantee is used instead of minimum revenue guarantee.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic

The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...

متن کامل

Analysis of a Build-Operate-Transfer Scheme for Road Franchising

Private provision of public roads through build-operate-transfer (BOT) contracts is increasing around the world. Under a BOT contract, a private firm would build a road, charge tolls to road users for a period, and then transfer the road to the government. By viewing a BOT contract as a combination of three variables of concession period, road capacity and toll charge, we study optimal BOT cont...

متن کامل

Valuing Government Guarantees in Toll Road Projects

The participation of private capital in public infrastructure investment projects has been sought by many governments who perceive this as a way to overcome budgetary constraints and foster economic growth. For some types of projects, this investment may require government participation in the form of project guarantees in order to reduce the risk of the private investor. As a consequence, the ...

متن کامل

Time-dependent Road Network Design Frameworks with Land Use Consideration: Policy Implications

In the past, transport network design focused on the effect of designs on the transport system alone but not on the land use system, and ignored the land use-transport interaction over time. This may result in obtaining suboptimal designs. Additionally, the impacts of road network improvement policies on the land use system, especially the benefit of landowners cannot be evaluated without consi...

متن کامل

A royalty negotiation model for BOT (build-operate-transfer) projects: The operational revenue-based model

Whilst few studies have explored royalty negotiations for build, operate and transfer (BOT) projects, some works have proposed numerous royalty formulas to evaluate royalty amounts or franchise fees for a BOT project. Despite this, the royalty negotiation process is one of the many critical negotiation items of a concession contract. This study not only developed a royalty negotiation model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010