Stable multi-project scheduling of airport ground handling services by heterogeneous agents
نویسندگان
چکیده
This paper addresses decentralized multi-project scheduling under uncertainty. The problem instance we study is the scheduling of airport ground handling services, where aircraft turnarounds can be seen as multiple projects, ground handling services as activities, and service providers as resources. In this environment aircraft requiring ground handling services and the corresponding service providers are self-interested autonomous parties. Moreover, the environment is well-known for its large number of disturbances. We employ a heterogeneous multiagent scheduling framework with two types of autonomous agents representing aircraft and ground service providers respectively. We use online scheduling to cope with uncertainty in the release time of project: the uncertainty in aircraft arrival time at an airport. To balance the interests of the two types of agents in this heterogeneous multiagent system, we propose a marketbased mechanism to assign time slots to aircraft turnaround activities. We study the use of this mechanism in a cooperative and a non-cooperative setting. In a dynamic environment such as airport ground handling, the execution of project schedules may be invalidated by various disruptions. As a result project agents may incur high costs if they have to reschedule some of their activities. The insertion of slack time between activities is a well known solution. The delay cost incurred by inserting slack should balance the expected costs of rescheduling some activities. Since in a dynamic multiagent system it is hard to analytically calculate optimal slack time between activities, we propose that agents determine these slack time using a co-evolutionary learning approach. Experiment show that our decentralized scheduling approach scores on average as high as well-established ORbased heuristics, and that slack times to keep a schedule stable can be learned.
منابع مشابه
Distribute the Selfish Ambitions
The distributed project scheduling problem is a distributed resource allocation problem extended with temporal constraints. Herein a project consists of a series of activities, the scarce resources are assigned to those activities at certain time windows such that all the activities are performed and certain objectives are optimized. In the past, methods from Operations Research (OR) and Artifi...
متن کاملHandling Airport Ground Processes Based on Resource-Constrained Project Scheduling
This paper describes how the Resource-Constrained Project Scheduling Problem (RCPSP) can be used as a basis for real-time decision support in the disruption management of the aircraft turnaround, the most typical airport ground process. For this purpose, the RCPSP is extended by the possibility to describe alternative activities, which can be used to model potential process modi cations. An evo...
متن کاملDecentralized scheduling of baggage handling using multi-agent technologies
Agile and lean manufacturing are the trendy buzz-words among manufacturers today. Lowvolume high-variety product series have radically changed the conditions for manufacturing systems. To handle the new challenges and continuously optimize production flow, new requirements for flexible manufacturing systems have been introduced. Moving away from dedicated hardware and mass production additional...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملCoordinating Competitive Agent in Dynamic Airport Resource Scheduling
In real-life multi-agent planning problems, long-term plans will often be invalidated by changes in the environment during or after the planning process. When this happens, short-term operational planning and scheduling methods have to be applied in order to deal with these changed situations. In addition to the dynamic environment, in such planning systems we also have to be aware of sometimes...