Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application
نویسندگان
چکیده
The resource-constrained project scheduling problem (RCPSP) is a significant challenge in highly regulated industries, such as pharmaceuticals and agrochemicals, where a large number of candidate new products must undergo a set of tests for certification. We propose a novel way of addressing the uncertainties in the RCPSP including the uncertainties in task durations and costs, as well as uncertainties in the results of tasks (success or failure) by using a discrete time Markov chain, which enables us to model probabilistic correlation of the uncertain parameters. The resulting stochastic optimization problem can be solved by using dynamic programming, but the computational load renders this impractical. Instead, we develop a new way to combine heuristic solutions through dynamic programming in the state space that the heuristics generate. The proposed approach is tested on a simplified version of RCPSP that has a fairly complicated stochastic nature, with 1,214,693,756 possible parameter realizations (scenarios), and involves five projects and 17 tasks. As a result, an on-line policy is obtained, which can use the information states in on-line decision making and improve the heuristics rather than a fixed solution obtained by the previous mathematical programming (MILP) problem formulations. © 2003 Elsevier Ltd. All rights reserved.
منابع مشابه
Splittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملAN EXPERIMENTAL INVESTIGATION OF THE SOUNDS OF SILENCE METAHEURISTIC FOR THE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH PRE-OPTIMIZED REPERTOIRE ON THE HARDEST MMLIB+ SET
This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & Chemical Engineering
دوره 28 شماره
صفحات -
تاریخ انتشار 2004