A Continuous-Time Strategic Capacity Planning Model*

نویسندگان

  • Woonghee Tim Huh
  • Robin O. Roundy
چکیده

Capacity planning decisions affect a significant portion of future revenue. In the semiconductor industry, they need to be made in the presence of both highly volatile demand and long capacity installation lead-times. In contrast to traditional discrete-time models, we present a continuous-time stochastic programming model for multiple resource types and product families. We show how this approach can solve capacity planning problems of reasonable size and complexity with provable efficiency. This is achieved by an application of the divide-and-conquer algorithm, convexity, submodularity, and the open-pit mining problem. © 2005 Wiley Periodicals, Inc. Naval Research Logistics 52: 329–343, 2005.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Continuous-Time Strategic Capacity Planning Model Based on the Minimum-Cut Problem

The semiconductor industry has been one of the driving forces of the “new” economy. It boasts of the exponentially growing performance of semiconductor devices, coupled with rapidly decreasing chip prices; however, it faces highly volatile demands, and copes with astronomical fab costs, most of which can be attributed to tool costs. The leadtime for purchasing tools is between 6 and 18 months, ...

متن کامل

A queuing-location model for in multi-product supply chain with lead time under uncertainty

Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...

متن کامل

Strategic planning trips within the city emphasize goals over travel using traffic assignment model topsis and GIS (Case study: Kerman)

Strategic management, program coordinator, which is comprehensive and continuous link with the environment and your organization's top talent, the goal of the organization is managed in a proper implementation.  Tuday One of the most important challenges facing large cities is transportation within the city. Lack of strategic planning for urban transport systems also joint ventures that replica...

متن کامل

Strategic Air Traffic Planning Using Eulerian Route Based Modeling and Optimization

OF THE DISSERTATION Strategic Air Traffic Planning Using Eulerian Route Based Modeling and Optimization By Alessandro Bombelli Doctor of Philosophy in Mechanical and Aerospace Engineering University of California, Irvine, 2017 Professor Kenneth D. Mease, Chair Due to a soaring air travel growth in the last decades, air traffic management has become increasingly challenging. As a consequence, pl...

متن کامل

An Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network

One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005