A system dynamics model for assessing the impacts of design errors in construction projects

نویسندگان

  • Sangwon Han
  • Peter E. D. Love
  • Feniosky Peña-Mora
چکیده

Design errors leading to rework and/or design changes are considered to be the primary contributor to schedule delays and cost overruns in design and construction projects. While design errors are deemed prevalent, most design and construction firms do not measure the number of errors they create, thereby having limited knowledge regarding their mechanism to undermine project performance. To address this, a system dynamics model has been developed to capture the dynamics of design errors and systematically assess their negative impacts. This paper reports on the development of the model, and its application to a university building project. The results indicate that design errors can significantly delay project schedule in spite of continuous schedule recovery actions taken by constructionmanagers. The case study also shows that schedule pressure can propagate the negative impact of design errors to numerous construction activities, including those that are not directly associated with the errors. Finally, the case study confirms that the developed model can more rigorously assess the negative impact of design errors, which is often underestimated by practitioners. Based on these results, it is concluded that the developed model can assist project managers in better understanding the dynamics of design errors and recovering delayed schedule, particularly under schedule pressure. © 2011 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Manager Competency Model based on ANP Method in Construction Projects

Most developed countries have already accepted‘’ Competency’’ as the major factor in making management more competitive, therefore they have discovered the importance of Qualification Models and their application to cause human resources growth. Consequently, their aim is to improve the qualification of their human resources, and to reach this end, considering different ways of assessing compet...

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

Change Management and Change Process Model for the Iranian Construction Industry

Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Mathematical and Computer Modelling

دوره 57  شماره 

صفحات  -

تاریخ انتشار 2013