Decompositions, Network Flows, and a Precedence Constrained Single-Machine Scheduling Problem
نویسندگان
چکیده
We present an in-depth theoretical, algorithmic and computational study of a linear programming (LP) relaxation to the precedence constrained single machine scheduling problem 1jprecj P j wjCj to minimize a weighted sum of job completion times. On the theoretical side, we study the structure of tight parallel inequalities in the LP relaxation and show that every permutation schedule which is consistent with Sidney's decomposition has total cost no more than twice the optimum. On the algorithmic side, we provide a parametric extension to Sidney's decomposition and show that a nest decomposition can be obtained by essentially solving a parametric minimum cut problem. Finally, we report results obtained by an algorithm based on these developments on randomly generated instances with up to 2,000 jobs.
منابع مشابه
Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Operations Research
دوره 51 شماره
صفحات -
تاریخ انتشار 2003