Probabilistic Risk Analysis and Project Capital Structures

نویسنده

  • David C. Rode
چکیده

Increases in the securitization and syndication of credit have led to a growing distance between borrowers and the ultimate lenders. As trends continue to encourage the efficient packaging and sale of loans, it has become important for lead lenders to convince fellow syndicate banks of the risk profile of the credit as quickly and effectively as possible. Likewise, having an understanding of how a firm’s value has changed as a result of financial distress is invaluable during a restructuring process. A key element in understanding the impact of risk on firm values is the differential response of the managers (equity) and lenders (debt) toward volatility. This paper develops a framework for using simulation analysis as a common platform from which to communicate about financing risks and capital structure. The methods outlined here can be used to optimize responses to restructuring scenarios by enabling a better match between expected cash flows and capital commitments.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

Thermo-economic analysis and optimization of cogeneration systems by considering economic parameters fluctuations

A successful cogeneration system design project needs an estimation of the economical parameters of the project, including capital investment, costs of fuel, expenses in maintenance and operating, and the proper cost for the products. This study describes the economic consideration of the benchmark cogeneration systems, called CGAM system located in the United States. To evaluate the profitabil...

متن کامل

An Integrated Risk-Based Technique for Project Plan Selection

  Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...

متن کامل

Probabilistic earthquake hazard Analysis with considering Risk-Based concept (Case study of olefin 14)

Background and objective: numerous seismic hazard analysis studies are conducted annually using probabilistic methods throughout the world and Iran, which are usually different from the initial assumptions of analysis or software used. On the other hand, many researches are presented every year about new methods of earthquake hazard zoning, but so far these studies have not computed earthquake ...

متن کامل

A Statistical-Probabilistic Pattern for Determination of Tunnel Advance Step by Quantitative Risk Analysis

One of the main challenges faced in design and construction phases of tunneling projects is the determination of maximum allowable advance step to maximize excavation rate and reduce project delivery time. Considering the complexity of determining this factor and unexpected risks associated with inappropriate determination of that, it is necessary to employ a method which is capable of accounti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003