Scheduling of coupled tasks and one-machine no-wait robotic cells
نویسندگان
چکیده
Coupled task scheduling problems were first studied more than 25 years ago. Several complexity results have been established in the meantime, but the status of the identical task case still remains unsettled. We describe a new class of equivalent one-machine no-wait robotic cell problems. It turns out that scheduling of identical coupled tasks corresponds to the production of a single part type in a robotic cell. We describe new algorithmic procedures to solve this robotic cell problem, allowing lower and upper bounds on the production time, and discussing in particular cyclic production plans. This research has been supported by INTAS Project 03-51-5501 This paper has appeared as a journal publication in: Computers & Operations Research, Volume 36, Issue 2, pages 301-307, February 2009. For information about the journal, see: http://www.elsevier.com/wps/find/journaldescription.cws home/300/description#description ∗[email protected], Tel: (33) 4 76 57 48 42, Fax: (33) 4 76 57 46 02
منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملA scalarization-based method for multiple part-type scheduling of two-machine robotic systems with non-destructive testing technologies
This paper analyzes the performance of a robotic system with two machines in which machines are configured in a circular layout and produce non-identical parts repetitively. The non-destructive testing (NDT) is performed by a stationary robotic arm located in the center of the circle, or a cluster tool. The robotic arm integrates multiple tasks, mainly the NDT of the part and its transition bet...
متن کاملPolynomial complexity of the cyclic identical coupled task problem
Coupled-tasks were introduced by Shapiro in 1980 for scheduling the operations of a radar [19]. The radar emits a pulse that is transmitted to a target and reflected back to the radar, which receives the pulse. Hence the radar must process two operations per task (emission and reception), and those operations are separated by a fixed duration. The coupled task scheduling problem is then to proc...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملComparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 36 شماره
صفحات -
تاریخ انتشار 2009