Disregarding Duration Uncertainty in Partial Order Schedules? Yes, We Can!

نویسندگان

  • Alessio Bonfietti
  • Michele Lombardi
  • Michela Milano
چکیده

In the context of Scheduling under uncertainty, Partial Order Schedules (POS) provide a convenient way to build flexible solutions. A POS is obtained from a Project Graph by adding precedence constraints so that no resource conflict can arise, for any possible assignment of the activity durations. In this paper, we use a simulation approach to evaluate the expected makespan of a number of POSs, obtained by solving scheduling benchmarks via multiple approaches. Our evaluation leads us to the discovery of a striking correlation between the expected makespan and the makespan obtained by simply fixing all durations to their average. The strength of the correlation is such that it is possible to disregard completely the uncertainty during the schedule construction and yet obtain a very accurate estimation of the expected makespan. We provide a thorough empirical and theoretical analysis of this result, showing the existence of solid ground for finding a similarly strong relation on a broad class of scheduling problems of practical importance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Partial Order Schedules for RCPSP/max with Durational Uncertainty

In this work, we consider RCPSP/max with durational uncertainty. We focus on computing robust Partial Order Schedules (or, in short POS) which can be executed with risk controlled feasibility and optimality, i.e., there is stochastic posteriori quality guarantee that the derived POS can be executed with all constraints honored and completion before robust makespan. To address this problem, we p...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

Reasoning about Executional Uncertainty to Strengthen Schedules

We consider a scheduling problem where the goal is to maximize the reward obtained by a team of agents in an execution environment with duration and activity outcome uncertainty. To address scalability issues, we take as our starting point a deterministic, partial-order schedule and attempt to hedge against activity failure by adding redundant backup activities into the agent schedules. There i...

متن کامل

Robust Local Search and Its Application to Generating Robust Schedules

In this paper, we propose an extended local search framework to solve combinatorial optimization problems with data uncertainty. Our approach represents a major departure from scenario-based or stochastic programming approaches often used to tackle uncertainty. Given a value 0 < ≤ 1, we are interested to know what the robust objective value is, i.e. the optimal value if we allow an chance of no...

متن کامل

Uncertainty analysis of hierarchical granular structures for multi-granulation typical hesitant fuzzy approximation space

Hierarchical structures and uncertainty measures are two main aspects in granular computing, approximate reasoning and cognitive process. Typical hesitant fuzzy sets, as a prime extension of fuzzy sets, are more flexible to reflect the hesitance and ambiguity in knowledge representation and decision making. In this paper, we mainly investigate the hierarchical structures and uncertainty measure...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014