A multi-exchange neighborhood for minimum makespan machine scheduling problems

نویسندگان

  • Antonio Frangioni
  • Emiliano Necciari
  • Maria Grazia Scutellà
چکیده

We propose new local search algorithms for minimum makespan machine scheduling problems, which perform multiple exchanges of jobs among machines. Inspired by the work of Thompson and Orlin (1989) on cyclic transfer neighborhood structures, we model multiple exchanges of jobs as special disjoint cycles and paths in a suitably defined improvement graph, by extending definitions and properties introduced in the context of VRP (Thompson and Psaraftis, 1993) and of CMST (Ahuja, Orlin and Sharma, 1998). Several algorithms for searching the neighborhood are suggested. We report the results of a wide computational experimentation, on different families of benchmark instances, performed for the case of identical machines. The minimum makespan machine scheduling problem with identical machines has been selected as a case study to perform a comparison among the alternative algorithms, and to discover families of instances for which the proposed neighborhood may be promising in practice. The obtained results are very interesting. On some families of instances, which are very hard to solve exactly, the most promising multi-exchange algorithms proved to dominate, in gap and in time, competitive benchmark heuristics. Subject classifications: Production/scheduling, Approximations/heuristic: multi-exchange neighborhood. Networks/graphs, Flow algorithms: disjoint cycle computation.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

A hybrid variable neighborhood search algorithm for solving multi-objective flexible job shop problems

In this paper, we propose a novel hybrid variable neighborhood search algorithm combining with the genetic algorithm (VNS+GA) for solving the multi-objective flexible job shop scheduling problems (FJSPs) to minimize the makespan, the total workload of all machines, and the workload of the busiest machine. Firstly, a mix of two machine assignment rules and two operation sequencing rules are deve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000