A new algorithm for multidimensional scheduling problems
نویسندگان
چکیده
In this work we consider the hybrid flexible flowline (HFFL) problem with a set of additional constraints that apply in real-world industrial environments. A set of n jobs has to be scheduled on a set of m ordered stages. All jobs are available at time 0, and job preemption is not allowed. Each stage i consists in mi parallel unrelated machines. Jobs might skip stages; we denote the stages visited by job j as the set Fj . At each stage i in Fj , job j should be processed by exactly one machine in the set of eligible machines Eij . Precedence constraints among jobs refrain job j from starting in the first stage before ending the process of its predecessor jobs Pj in the last stage. Setup times Siljk depend on both the previous job j and the next job k, and on the stage i and machine l where the setup is executed. These times can be anticipatory or non-anticipatory. Time lags lagilj between finishing a job j at stage i and starting the job at the next stage, can be positive or negative and depend on the machine l that job j is assigned to at stage i. Machines release dates are given by the input parameter relij. The goal is to find a schedule that minimises the makespan, that is, the maximum job completion time. The gap between HFFL theory and scheduling practice is named in two reviews on HFFL problems [1, 2]. For a more recent review, see [3].
منابع مشابه
An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کاملA New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملA New model for integrated lot sizing and scheduling in flexible job shop problem
In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...
متن کاملA New Approach in Job Shop Scheduling: Overlapping Operation
In this paper, a new approach to overlapping operations in job shop scheduling is presented. In many job shops, a customer demand can be met in more than one way for each job, where demand determines the quantity of each finished job ordered by a customer. In each job, embedded operations can be performed due to overlapping considerations in which each operation may be overlapped with the other...
متن کاملَA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
متن کاملNew Heuristic Algorithm for Flow Shop Scheduling with 3 Machines and 2 Robots Considering the Breakdown Interval of Machines and Robots Simultaneously
Scheduling is an important subject of production and operations management area. In flow-shop scheduling, the objective is to obtain a sequence of jobs which when processed in a fixed order of machines, will optimize some well defined criteria. The concept of transportation time is very important in scheduling. Transportation can be done by robots. In situations that robots are used to transpor...