Resource Allocation Under Stochastic Demands

نویسندگان

  • Fangfei Chen
  • Thomas La Porta
  • Mani B. Srivastava
  • Matthew P. Johnson
چکیده

Military theater settings may involve many competing missions whose whose requirements tax the coalition’s resources in multiple dimensions—i.e., requiring different amounts of many different kinds of resources, e.g., fuel, bandwidth, personnel, etc., each of which is available in limited supply— and in uncertain or stochastic amounts. To serve the overall mission, we need to satisfy resource requirements in multiple dimensions, subject to capacity constraint of each dimension. Therefore, a given theater, as the unit with which some limited resources are associated, can only admit a subset of the users/tasks at the same time. If weights or profits can be associated with tasks, representing their importance, a natural goal is to maximize the total profit admitted to the system, consistent with the resource limitations. If tasks have deterministic demands we can think of the capacity of each resource as the capacity of an abstract (onedimensional) knapsack; together, these tasks and the capacity bounds form an instance of the multidimensional knapsack problem. In practice, however—think of fast-changing battlefield conditions—demands for resources may change over time and only their statistics or distributions may be known a priori. In this case, the demand of each task is a random vector, the elements of which indicate its varying needs for multiple resources. Certain important distributions on the demand vectors are of particular interest, such as a Bernoulli distribution of (s, q), under which, at each step, a mission either requires s of a resource with the probability of q, or none. Other examples may be an exponential distribution (implying a certain service time), a Poisson distribution (indicating an arrival rate of event) or combinations of these distributions. A simple, naive approach to dealing with the stochastic demands would be to assign tasks based on their maximum possible demands. This not only leads to low utilization of resources but also applies to few distributions, however; tasks with unbounded distributions such as the exponential distribution may never be admitted to the system. Statistical multiplexing [1] is more suitable in that uncorrelated demands are packed together allowing occasional violations of the capacity constraints. Particularly, the overflow probability, which indicates the chance that admitted tasks violate the capacity constraints, should be bounded by a predetermined value p. In general, solving such a problem relates to solving a chance-constrained program, which involves nonlinear optimization techniques. Recently, Sample Average Approximation (SAA) has been applied to such problems [2], [3]. Those works provide promising results for a more general problem but the solution is based on Monte Carlo simulation. We use SAA here to derive an upper bound to evaluate solutions to an abstract formulation of the problem. The main idea in solving this problem lies in the development of an effective bandwidth or effective size representing the stochastic demands. The concept of effective bandwidth has been widely used in the field of admission control and bandwidth management. This is a special case of our problem, because in these prior works bandwidth is the only resource to allocate. Kleinberg et al. [4] provided another definition for some restricted cases and proposed approximation algorithms. Our task is to extend this to the multidimensional case. For a d-dimensional random vector v, its effective size βp(v) takes as input an allowable overflow probability p and can be either a deterministic d-dimensional vector or simply a scalar. Once such a metric is developed, one can turn the problem into a deterministic (multidimensional) knapsack problem. Via comprehensive numerical experiments including settings in which demands follow a mix of different distributions, we show that the general effective bandwidth paired with multidimensional knapsack heuristics can generate satisfactory results. However, in many cases, the allocations are conservative. Therefore, we propose an effective way to relax the constraints in the resulting deterministic problem, in order to achieve near-optimal solutions (details omitted). Our main contributions include:

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making

Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...

متن کامل

A New Hybrid Algorithm to Optimize Stochastic-fuzzy Capacitated Multi-Facility Location-allocation Problem

Facility location-allocation models are used in a widespread variety of applications to determine the number of required facility along with the relevant allocation process. In this paper, a new mathematical model for the capacitated multi-facility location-allocation problem with probabilistic customer's locations and fuzzy customer’s demands under the Hurwicz criterion is proposed. Thi...

متن کامل

Reliability-oriented multi-resource allocation in a stochastic-flow network

A stochastic-flow network consists of a set of nodes, including source nodes which supply various resources and sink nodes at which resource demands take place, and a collection of arcs whose capacities have multiple operational states. The network reliability of such a stochastic-flow network is the probability that resources can be successfully transmitted from source nodes through multi-capa...

متن کامل

An Approximation Algorithm for Solving Multistage, Stochastic, Dynamic Resource Allocation Problems with Single Period Travel Times

We consider a stochastic version of a dynamic resource allocation problem. In this setting, reusable resources must be assigned to demands that arise randomly over time. Both resources and demands are heterogeneous, and satisfying a demand generally will change the attributes of a resource. These problems arise in eet management, personnel training and assignment, and the remnant inventory prob...

متن کامل

A Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks

The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume that the work content required by the activities follows an exponential distribution. The decision variables of the model are the allocated resourc...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012