Design of Prototype Models for Some Problems Facing Large-Scale Configuration Management
نویسندگان
چکیده
This is the fourth report from the GridWeaver project. It describes a demonstrator that showcases a subset of the concepts explored in the previous report [ABK03a]. The aim of the demonstrator is to illustrate that we can model, configure, and manage a complex, adaptive system, using our prototype LCFG/SmartFrog architecture as the deployment environment. To achieve our goal, we created a prototype, OGSAcompliant printing service, which we call GPrint. Revision 1.1 – September 29, 2003
منابع مشابه
Solving the tandem AGV network design problem using tabu search: Cases of maximum workload and workload balance with fixed and non-fixed number of loops
A tandem AGV configuration connects all cells of a manufacturing area by means of non-overlapping, sin-gle-vehicle closed loops. Each loop has at least one additional P/D station, provided as an interface between adjacent loops. This study describes the development of three tabu search algorithms for the design of tandem AGV systems. The first algorithm was developed based on the basic definiti...
متن کاملA Case-Study of Configuration Management with ClearCase in an Industrial Environment
This paper reports from a case study where the configuration management system ClearCase is used in a large scale industrial application. The focus of the study is on the functionality offered and how it matches the needs in this particular situation. The paper reports on situations where ClearCase has turned out to be cumbersome to use or is lacking functionality. Improvements are outlined for...
متن کاملA Hybrid Solution Approach Based on Benders Decomposition and Meta-Heuristics to Solve Supply Chain Network Design Problem
Supply Chain Network Design (SCND) is a strategic supply chain management problem that determines its configuration. This mainly focuses on the facilities location, capacity sizing, technology selection, supplier selection, transportation, allocation of production and distribution facilities to the market, and so on. Although the optimal solution of the SCND problem leads to a significant reduc...
متن کاملDISCRETE AND CONTINUOUS SIZING OPTIMIZATION OF LARGE-SCALE TRUSS STRUCTURES USING DE-MEDT ALGORITHM
Design optimization of structures with discrete and continuous search spaces is a complex optimization problem with lots of local optima. Metaheuristic optimization algorithms, due to not requiring gradient information of the objective function, are efficient tools for solving these problems at a reasonable computational time. In this paper, the Doppler Effect-Mean Euclidian Distance Threshold ...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003