Incremental Constraint-Posting Algorithms in Interleaved Planning and Scheduling

نویسندگان

  • Amanda Coles
  • Andrew Coles
  • Maria Fox
  • Derek Long
چکیده

In this paper we examine a collection of related incremental constraint-posting algorithms for temporal planning and for planning with continuous processes. The basis for these algorithms is an incremental version of the Bellman-Ford single-source shortest-path algorithm for consistency checking Simple Temporal Networks (STNs). We extend an existing incremental algorithm for STNs and then proceed to show how this algorithm plays a key role in temporal planning by a forward-chaining strategy, interleaving action choice with action scheduling. We go on to consider the more complex problem of temporal planning with continuous linear processes and show how the incremental STN algorithm can be integrated with a linear program (LP) solver, to achieve an efficient incremental constraint-posting algorithm for use in a forward-search planner. We demonstrate empirically that the incremental algorithms improve performance in both temporal and temporal and numeric settings.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Gaining Efficiency and Flexibility in the Simple Temporal Problem

The paper deals with the problem of managing quantitative temporal networks without disjunctive constraints. The problem is known as Simple Temporal Problem. Dynamic management algorithms are considered to be coupled with incremental constraint posting approaches for planning and scheduling. A basic algorithm for incremental propagation of a new time constraint is presented that is a modificati...

متن کامل

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

Scheduling a Single Robot in a Job-Shop Environment through Precedence Constraint Posting

The paper presents recent work on using robust state-of-the-art AI Planning and Scheduling (P&S) techniques to provide autonomous capabilities in a space robotic domain. We have defined a simple robotic scenario, reduced it to a known scheduling problem which is addressed here with a constraint-based, resource-driven reasoner. We present an initial experimentation that compares different meta-h...

متن کامل

Incrementally Solving the STP by Enforcing Partial Path Consistency

The Simple Temporal Problem (STP) appears as a subproblem of many planning and scheduling problems. Recently, we have published a new algorithm to solve the STP, calledPC, and have showed that it outperformed all existing algorithms. Our approach was based on enforcing partial path consistency (PPC), starting from a chordal constraint graph. When dealing with complex problems, e.g. planning pro...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009