Interaction in Hybrid Intelligent Scheduling
نویسندگان
چکیده
Human schedulers tend to approach their task in an opportunistic way (Woods and Roth, 1988). This requires an interactive system in which the interface elements, and their location, are not tightly bound to a restrictive perspective of the problem. The architecture of a hybrid intelligent system developed by the author is shown in Figure 1. Two types of display — the Jobs Screens and the Gantt Chart — allow the human scheduler to interact with the computing system. There is a separate Jobs Screen for each machine and one for jobs yet to be allocated to a machine. During decision making, the human scheduler focuses primarily on the Jobs Screens. Meanwhile, the scheduler keeps an eye on the current state of the Gantt chart to see when jobs are expected to be loaded and completed.
منابع مشابه
Intelligent scheduling for emergency room(ER) personnel to improve productivity
Improving productivity in emergency services and managing limited resources of emergency room(ER) are key challenges for health managers of oil industry. One critical and costly resource is ER personnel and its lack can lead to long queue of patients. Thus appropriate scheduling for nurses and physicians can help ER managers to get maximum benefit of their current human resource and reduce th...
متن کاملOn Performance Analysis of Hybrid Intelligent Algorithms (Improved PSO with SA and Improved PSO with AIS) with GA, PSO for Multiprocessor Job Scheduling
Many heuristic-based approaches have been applied to finding schedules that minimize the execution time of computing tasks on parallel processors. Particle Swarm Optimization is currently employed in several optimization and search problems due its ease and ability to find solutions successfully. A variant of PSO, called as Improved PSO has been developed in this paper and is hybridized with th...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملParallel Robot Scheduling to Minimize Mean Tardiness with Unequal Release Date and Precedence Constraints Using a Hybrid Intelligent System
This paper considers the problem of scheduling a given number of jobs on a specified number of identical parallel robots with unequal release dates and precedence constraints in order to minimize mean tardiness. This problem is strongly NP‐hard. The author proposes a hybrid intelligent solution system, which uses Genetic Algorithms and Simulated Annealing (GA+SA). A genetic ...
متن کاملA HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1998