Towards a Lean Understanding of Resource Allocation in a Multi-project Sub-contracting Environment

ثبت نشده
چکیده

For many reasons, subcontracting is prevalent throughout the construction industry. Multiple subcontractors each perform work on multiple projects simultaneously. Each subcontractor strives to win sufficient jobs so as to ensure a ready supply of available work; each project manager strives to control the subcontractors on his/her project to maintain costand schedule-compliance, often pushing them to perform even when conditions preclude efficient or quality work. Construction subcontracting suffers the ills of traditional push workflows, but the problem for individual projects is exacerbated by subcontractors optimizing their workload across multiple projects, creating a snowball effect of growing instability for each individual project. Much of the research and implementation of lean construction has been carried out within the conceptual boundary of a single project or a single value stream. This paper proposes a multi-project, multi-subcontractor approach aimed at developing better understanding of workflow from the subcontractors' point of view, and contributing to development of a multi-project and multi-sub-contracting theory of production in construction projects. It attempts to define the questions, scope and methods for the research. A solution approach using an economic model is proposed. The long-term goal is to enable development of sub-contracting relationships and management procedures that harness the potential for both contractors and sub-contractors to benefit.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model for Sharing the Costs of Uncontrollable Risks among Contracting Parties

The allocation of risks among the contracting parties in a contract is an important decision affecting the project success. Some risks in a project are uncontrollable; these are imposed to a project by external factors. Since contracting parties can neither control nor affect the occurrence of such risks, their allocation to a party would be inequitable. Therefore the cost overrun related to un...

متن کامل

A Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks

The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume that the work content required by the activities follows an exponential distribution. The decision variables of the model are the allocated resourc...

متن کامل

A heuristic method for consumable resource allocation in multi-class dynamic PERT networks

This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a n...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Asymptotic Close to Optimal Resource Allocation in Centralized Multi-band Wireless Networks

This paper concerns sub-channel allocation in multi-user wireless networks with a view to increasing the network throughput. It is assumed there are some sub-channels to be equally divided among active links, such that the total sum rate increases, where it is assumed each link is subject to a maximum transmit power constraint. This problem is found to be a non-convex optimization problem and i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004