Proportionate flow shop games

نویسندگان

  • Arantza Estévez-Fernández
  • Manuel A. Mosquera
  • Peter Borm
  • Herbert Hamers
چکیده

In a proportionate flow shop problem several jobs have to be processed through a fixed sequence of machines and the processing time of each job is equal on all machines. By identifying jobs with agents whose costs linearly depend on the completion time of their jobs and assuming an initial processing order on the jobs, we face two problems: the first is how to obtain an optimal order that minimizes the total processing cost, the second is how to allocate the cost savings obtained by ordering the jobs optimally. In this paper we focus on the allocation problem. PFS games are defined as cooperative games associated to proportionate flow shop problems. It is seen that PFS games have a nonempty core. Moreover, it is shown that PFS games are convex if the jobs are initially ordered in decreasing urgency. For this case an explicit game independent expression for the Shapley value is provided. The authors thank two referees for their valuable suggestions for improvement. M.A. Mosquera acknowledges the financial support of Ministerio de Ciencia y Tecnología, FEDER, Xunta de Galicia (projects SEJ2005-07637-C02-02 and PGIDIT06PXIC207038PN). A. Estévez-Fernández ( ) Department of Econometrics and Operations Research, VU University Amsterdam, De Boelelaan 1105, 1081 HV Amsterdam, The Netherlands e-mail: [email protected] M.A. Mosquera Department of Statistics and Operations Research, Faculty of Business Administration and Tourism, University of Vigo, 32004 Ourense, Spain P. Borm · H. Hamers CentER and Department of Econometrics and Operations Research, Tilburg University, P.O. Box 90153, 5000 LE Tilburg, The Netherlands

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A note on the proportionate flow shop with a bottleneck machine

Choi, B.-C., Yoon, S.-H., Chung, S.-J., 2007. Minimizing maximum completion time in a proportionate flow shop with one machine of different speed. European Journal of Operational Research 176, 964–974 consider the proportionate flow shop with a slow bottleneck machine and propose the SLDR heuristic for it. Choi et al. (2007) derive a data-dependent worst-case ratio bound for the SLDR heuristic ...

متن کامل

Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm

The proportionate flow shop (PFS) is considered as a unique case of the flow shop problem in which the processing times of the operations belonging to the same job are equal. A proportionate flexible flow shop (PFFS) is a machine environment with parallel identical machines at each stage. This study presents an effective hybrid approach based on constructive genetic algorithm (CGA) for PFFS sch...

متن کامل

A note on makespan minimization in proportionate flow shops

We consider two generalizations of the proportionate flow shop scheduling problem with the makespan objective. Each job has a processing requirement and each machine has a characteristic value. In our first (second) case we assume that the time a job occupies a machine is the maximum (minimum) of the processing requirement of the job and the characteristic value of the machine. We show that the...

متن کامل

Batch sequencing and cooperation

Game theoretic analysis of sequencing situations has been restricted to manufacturing systems which consist of machines that can process only one job at a time. However, in many manufacturing systems, operations are carried out by batch machines which can simultaneously process multiple jobs. This paper aims to extend the game theoretical approach to the cost allocation problems arising from se...

متن کامل

COVERT Based Algorithms for Solving the Generalized Tardiness Flow Shop Problems

Four heuristic algorithms are developed for solving the generalized version of tardiness flow shop problems. We consider the generalized tardiness flow shop model with minimization of the total tardiness as its performance measure. We modify the concept of cost over time (COVERT) for the generalized version of the flow shop tardiness model and employ this concept for developing four algorithms....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Scheduling

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2008