A Markovian Model for Dynamic and Constrained Resource Allocation Problems

نویسندگان

  • Camille Besse
  • Brahim Chaib-draa
چکیده

An autonomous agent, allocating stochastic resources to incoming tasks, faces increasingly complex situations when formulating its control policy. These situations are often constrained by limited resources of the agent, time limits, physical constraints or other agents. All these reasons explain why complexity and state space dimension increase exponentially in size of considered problem. Unfortunately, models that already exist either consider the sequential aspect of the environment, or its stochastic one or its constrained one. To the best of our knowledge, there is no model that take into account all these three aspects. For example, dynamic constraint satisfaction problems (DCSP) have been introduced by Dechter & Dechter (1988) to address dynamic and constrained problems. However, in DCSPs, there is typically no transition model, and thus no concept of sequence of controls. On the other hand, Fargier, Lang, & Schiex (1996) proposed mixed CSPs (MCSPs), but this approach considers only the stochastic and the constrained aspects of the problem. In this paper, we introduce a new model based on DCSPs and Markov decision processes to address constrained stochastic resource allocation (SRA) problems by using expressiveness and powerfulness of CSPs. We thus propose a framework which aims to model dynamic and stochastic environments for constrained resources allocation decisions and present some complexity and experimental results.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making

Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007