Enhanced Precedence Scheduling Algorithm with Dynamic Time Quantum (EPSADTQ)
نویسندگان
چکیده
This study proposes a new algorithm which is a logical extension of the popular Round Robin CPU scheduling algorithm. The Round Robin algorithm can be effective only if the time quantum is chosen accurately. Even by taking mean average of burst times as time quantum, the performance of the RR cannot be improved beyond a certain point. However, the novel method proposed here, suggests that a priority be assigned to each process based on balanced precedence factor. The novel method also uses mean average as a time quantum. Experiments are conducted in order to measure the effectiveness of this novel method. The results clearly showed that EPSADTQ is superior to RR and PSMTQ and its variants. EPSADTQ resulted in a significant reduction of the no. of context switches, average waiting time and average turnaround time.
منابع مشابه
An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملModified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...