How do OSS Projects Change in number and Size? A Large-Scale Analysis to Test a Model of Project growth

نویسندگان

  • Frank Schweitzer
  • Vahan Nanumyan
  • Claudio J. Tessone
  • Xi Xia
چکیده

Established Open Source Software (OSS) projects can grow in size if new developers join, but also the number of OSS projects can grow if developers choose to found new projects. We discuss to what extent an established model for firm growth can be applied to the dynamics of OSS projects. Our analysis is based on a large-scale data set from SourceForge (SF) consisting of monthly data for 10 years, for up to 360 000 OSS projects and up to 340 000 developers. Over this time period, we find an exponential growth both in the number of projects and developers, with a remarkable increase of single-developer projects after 2009. We analyze the monthly entry and exit rates for both projects and developers, the growth rate of established projects and the monthly project size distribution. To derive a prediction for the latter, we use modeling assumptions of how newly entering developers choose to either found a new project or to join existing ones. Our model applies only to collaborative projects that are deemed to grow in size by attracting new developers. We verify, by a thorough statistical analysis, that the Yule-Simon distribution is a valid candidate for the size distribution of collaborative projects except for certain time periods where the modeling assumptions no longer hold. We detect and empirically test the reason for this limitation, i.e., the fact that an increasing number of established developers found additional new projects after 2009.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

Multi-criteria approach to project portfolio selection considering structural hardness and correlations between projects

Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...

متن کامل

Identification of Pattern used in Determination of Critical Success Factors in ITS Projects, Case Study: Road Maintenance and Transportation Organization

One of the risks recognized by relevant authorities is the risk of outsourcing ITS projects. The purpose of this study was to design and explain the pattern of determining the critical success factors in outsourcing large-scale ITS projects in the Ministry of Roads and Urban Development (Road Maintenance and Transportation Organization). This study was performed using qualitative method. The pa...

متن کامل

Constructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis

Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...

متن کامل

Qualitative Sustainability Assessment of the Large- Scale Redevelopment Plan in Samen District of Mashhad

Redevelopment of distressed and blighted areas are targeted by most of development policies.However, a number of policies have been changed as the result of the ineffectiveness of the previous experiences, theincompatibility of the development tools and plans, the lack of financial resources or social movements. Large-scaleredevelopment projects have usually been considered as the powerful tool...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Advances in Complex Systems

دوره 17  شماره 

صفحات  -

تاریخ انتشار 2014