Causes Leading to Poor site Coordination in Building Projects

نویسنده

  • Andrew Price
چکیده

The construction industry is one of the main pillars of Hong Kong’s economy. It employed eight per cent of approximately three million working population of Hong Kong according to government statistics. Over the years, Hong Kong construction industry has earned a reputation for the rapid construction of quality high-rise first class buildings. Due to fluctuation of workload, there is a high level of subcontracting in the projects. According to government statistics, labour-only subcontractors and fee subcontractors contributed 24 per cent and 42 per cent of the gross value of construction work performed in 2008 respectively. As a result, the role of main contractors have gradually transformed from a constructor to a manager of subcontractors of the project. subcontracting, site coordination problems, performance

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Essential Causes Of The Critical Site Coordination Problems In Building Projects: A Hong Kong Study

In Hong Kong, main contractors of building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are unable to perform to their full capacity due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. Six critical site coordination problems caused by main contractors that had adversely influence...

متن کامل

کاربرد روش تحلیل سلسله مراتبی (AHP) در مکان‌یابی جایگاه دفن پسماند شهر سمنان

Backgrounds and Objectives: Landfill site selection is an important action in integrated solid waste management process. Difference criteria should be paid attention in site selection, so using of special methods are necessary to assimilate the criteria. In this research, GIS software and Analytical Hierarchy Process were used.Materials and Methods: First of all, maps were built in considering ...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated wi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010