Risk management: A tool for improving nuclear power plant performance
ثبت نشده
چکیده
FOREWORD This technical document on risk management as a tool for improving nuclear power plant (NPP) operations is part of an ongoing project on management of NPP operations in a competitive environment. The overall objective of this project is to assist the management of operating organizations and NPPs in identifying and implementing appropriate measures to remain competitive in a rapidly changing business environment. Other reports developed through this project have identified overall strategies and techniques that NPP operating organization managers can use to succeed in more competitive energy markets. For example, in IAEA-TECDOC-1123, Strategies for Competitive Nuclear Power Plants, one of the most important strategies identified was integrated risk management. This publication provides a recommended structure for risk management along with examples of how NPP operating organizations are using this tool to help them integrate safety, operational and economic-related risks in a changing business environment. The IAEA wishes to thank all participants and their Member States for their valuable contributions. The IAEA officer responsible for this publication is T. Mazour of the Division of Nuclear Power. The use of particular designations of countries or territories does not imply any judgement by the publisher, the IAEA, as to the legal status of such countries or territories, of their authorities and institutions or of the delimitation of their boundaries. The mention of names of specific companies or products (whether or not indicated as registered) does not imply any intention to infringe proprietary rights, nor should it be construed as an endorsement or recommendation on the part of the IAEA.
منابع مشابه
Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
متن کاملRole of Human Factor in Energy Conservation: Case of Bushehr Nuclear Power Plant
Humans are an integral part of power plants, ranging from construction to routine maintenance. Analysis of the presence and performance of the human factor can play an effective role in reducing and/or optimizing the use of energy resources. Therefore, in this research the investigation of the plant operator's presence direction in order to control a type of accident with the implementation of ...
متن کاملRole of Human Factor in Energy Conservation: Case of Bushehr Nuclear Power Plant
Humans are an integral part of power plants, ranging from construction to routine maintenance. Analysis of the presence and performance of the human factor can play an effective role in reducing and/or optimizing the use of energy resources. Therefore, in this research the investigation of the plant operator's presence direction in order to control a type of accident with the implementation of ...
متن کاملNUREG-1521, "Technical Review of Risk-Informed, Performance-Based Methods for Nuclear Power Plant Fire Protection Analyses," Draft Report for Comment
The Nuclear Regulatory Commission (NRC) has instituted an initiative for regulatory improvement to focus licensee and NRC resources on risksignificant activities, and to decrease the prescriptiveness of its regulations through performance-based methods that allow licensees increased flexibility in implementing NRC regulations. The NRC has identified risk-informed methods utilizing insights from...
متن کاملInternational Project Risk Management for Nuclear Power Plant (NPP) Construction: Featuring Comparative Analysis with Fossil and Gas Power Plants
The concern of risk management has continuously increased in international construction projects. International projects have a high level of risk and complexity, which results in greater possibilities of cost overruns and schedule conflicts when compared with local projects. Therefore, the goal of risk management is to improve project performance by systematically identifying and assessing pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2001