Direct Optimization of an Open Cut Scheduling Policy

نویسندگان

  • Marcos Goycoolea
  • Adolfo Ibañez
چکیده

Given a block-model of an open cut mine, a production scheduling policy defines which blocks should be extracted, when they should be extracted, and what should be done with them once extracted (i.e., sent to a mill, waste-dump, stockpile, etc.). The conventional three-step heuristic for constructing such a scheduling is as follows: First, compute an ultimate-pit. Second, subdivide the ultimate-pit into phases. Third, schedule the blocks in each bench-phase, taking into account the mining, milling and market/refining capacities. Though each of these steps is in itself an optimization problem, the three steps, when put together, constitute a piece-meal approach to the full problem. Recent developments make it possible to implement a direct optimization methodology using integer programming (IP) that can tackle real-sized problems. In this article we first compare such a direct approach to a commercial implementation of the traditional methodology (Gemcom Whittle) and find that the direct approach yields solutions with significantly higher value. In an attempt to explain this difference, we modify the IP approach so as to generate solutions more similar to those obtained by the traditional approach. We find that this modified approach still outperforms the commercial solver. We conclude that the direct approach attains higher value primarily because the commercial solver’s heuristics are not effective in the problems considered. In fact, we find that the traditional methodology, if executed exactly, yields near-optimal solutions on all our benchmark problems. We do not consider blending, stockpiles, or operational spatial constraints (e.g., only “best-case” solutions). 2 M. GOYCOOLEA ET AL.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cat swarm optimization for solving the open shop scheduling problem

This paper aims to prove the efficiency of an adapted computationally intelligence-based behavior of cats called the cat swarm optimization algorithm, that solves the open shop scheduling problem, classified as NP-hard which its importance appears in several industrial and manufacturing applications. The cat swarm optimization algorithm was applied to solve some benchmark instances from the lit...

متن کامل

An Integrated Model for Storage Location Assignment and Storage/Retrieval Scheduling in AS/RS system

An integrated optimization framework, including location assignment under grouping class-based storage policy and schedule of dual shuttle cranes, is offered by presenting a new optimization programming model. The objective functions, which are considered at this level, are the minimization of total costs and energy consumption. Scheduling of dual shuttle cranes among specified locations, which...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Reliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System

In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...

متن کامل

Cut-off Grade Optimization for Maximizing the Output Rate

In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013