Consider the problem of sequencing n jobs with general precedence constraints on a single machine to minimize total weighted completion time, which is NP-complete. However some class of problems can be solved in polynomial time, i.e .. the problems whose precedence constraints are trees or series parallel. This paper proposes an O(n4) algorithm for implementing a decomposition procedure due to Sidney. It also shows that if each decomposed sub graph is series parallel, then the problem is solved in 0(n ) running time, even if the whole graph is not series parallel.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

On the Approximability of Average Completion Time Scheduling under Precedence Constraints

We consider the scheduling problem of minimizing the average weighted job completion time on a single machine under precedence constraints. We show that this problem with arbitrary job weights, the special case of the problem where all job weights are one, and several other special cases of the problem all have the same approximability threshold with respect to polynomial time approximation alg...

متن کامل

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

A Cuckoo search algorithm (CSA) for Precedence Constrained Sequencing Problem (PCSP)

Precedence constrained sequencing problem (PCSP) is related to locate the optimal sequence with the shortest traveling time among all feasible sequences. In PCSP, precedence relations determine sequence of traveling between any two nodes. Various methods and algorithms for effectively solving the PCSP have been suggested. In this paper we propose a cuckoo search algorithm (CSA) for effectively ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009