A Constructive Algorithm to Minimise the Makespan on Identical Parallel Machines
نویسندگان
چکیده
In this paper we present constructive algorithms for the classical deterministic scheduling problem of minimising the makespan on identical parallel machines. Since the problem is known to be NP-hard in the strong sense, the approximate algorithms play a relevant role when solving this problem. The proposed algorithms are based on list scheduling procedures. The algorithms consist in not taking into consideration all the machines at the beginning, but taking into account subsets of machines, step by step, until the full set of machines are employed. Computational results show that the proposed algorithms perform very well, taking less time to run than the seminal Longest Processing Time First Algorithm.
منابع مشابه
Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...
متن کاملMinimizing Makespan on Identical Parallel Machines
A heuristic algorithm that uses iteratively LPT and MF approaches on different job and machine sets constructed by using the current solution is developed to solve a classical multiprocessor scheduling problem with the objective of minimizing the makespan. Computational results indicate that the proposed algorithm is very competitive with respect to well-known constructive algorithms for a larg...
متن کاملHeuristic Algorithms For Scheduling Jobs On Identical Parallel Machines Via Measures Of Spread
Constructive heuristics for the scheduling problem of n independent jobs on m identical parallel machines with minimum makespan objective are described. The proposed algorithms, which are n log n algorithms as the LPT algorithm of Graham, iteratively combine partial solutions that are obtained by partitioning the set of jobs into suitable families of subsets. The procedure used to partition the...
متن کاملParallel Machine Scheduling Problem
A new constructive heuristic for the scheduling problem of n independent jobs on m identical parallel machines with minimum makespan objective is described. The proposed algorithm, which is an n logn algorithm as the LPT algorithm of Graham, iteratively combines partial solutions that are obtained by partitioning the set of jobs in suitable families of subsets. The algorithm was tested using di...
متن کاملNew Formulation and Solution in PCB Assembly Systems with Parallel Batch processors
This paper considers the scheduling problem of parallel batch processing machines with non-identical job size and processing time. In this paper, a new mathematical model with ready time and batch size constraints is presented to formulate the problem mathematically, in which simultaneous reduction of the makespan and earliness-tardiness is the objective function. In recent years, the nature-in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002