“ The Contract for Deed Prevalence Project ” A Final

نویسندگان

  • Peter M. Ward
  • Heather K. Way
  • Lucille Wood
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model for Sharing the Costs of Uncontrollable Risks among Contracting Parties

The allocation of risks among the contracting parties in a contract is an important decision affecting the project success. Some risks in a project are uncontrollable; these are imposed to a project by external factors. Since contracting parties can neither control nor affect the occurrence of such risks, their allocation to a party would be inequitable. Therefore the cost overrun related to un...

متن کامل

Explain the optimal pattern in the contracts of public private Participation construction, exploitation and transfer (BOT) Applied to Contracts Theory

In recent decade in developing countries, lack of government budget or lack of access to modern technology, persuade governments to attract private sector participation in the economy. One of the most common methods is Public-Private Partnership agreements. The real implementation of this type of partnership needs to set contracts that satisfies preferences of both parties. This research aims t...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract

In this paper, seller-buyer supply chain coordination with general side-payment contracts is introduced to gain the maximum possible chain profit. In our model, the logistics costs for both buyer and seller are considered and the final demand is also supposed to be a decreasing function of the retail price. Since parties aim to maximize their individual profits, the contractual parameters are s...

متن کامل

ارانه الگوی رتبه بندی HSE پیمانکاران پیش از عقد قرارداد بر اساس سطح پیمان

  Background and aims: ‏ Evaluation of the contractor’s HSE is a key issue for the employer that influences the selection of a contractor. An appropriate method of assessment can play a significant role in the selection of qualified contractors. This paper presents a new method for ranking of contractor’s HSE at pre-contract stage of a project.   Methods: To develop this new evaluation method, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012