Scheduling Projects with Labour Constraints

نویسندگان

  • C. C. B. Cavalcante
  • C. Carvalho
چکیده

In this paper we consider a labour constrained scheduling problem (LCSP) which is a simpliication of a practical problem arising in industry. Jobs are subject to precedence constraints and have speciied processing times. Moreover, for each job the labour requirement varies as the job is processed. Given the amount of labour available in each period, the problem is to nish all the jobs as soon as possible, that is, to minimize makespan, subject to the precedence and labour constraints. Several Integer Programming (IP) formulations for this problem are discussed and valid inequalities for these diierent models are introduced. It turns out that a major drawback in using the IP approach is the weakness of the lower bound relaxations. However, we report computational experiments showing how the solution of the linear relaxation of the IP models can be used to provide good schedules. Solutions arising from these LP-based heuristics are considerably improved by local search procedures. We further exploit the capabilities of local search for LCSP by designing 1 1 a Tabu Search algorithm. The computational experiments on a benchmark data set show that the Tabu algorithm generates the best known upper bounds for almost all these instances. We also show how IP can be used to provide reasonably good lower bounds for LCSP when the makespan is replaced by suitably modiied objective functions. Finally some directions for further investigations which may turn IP techniques into a more interesting tool for solving such a problem are suggested.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007