Energy-aware integrated process planning and scheduling for job shops

نویسندگان

  • Min Dai
  • Dunbing Tang
  • Yuchun Xu
  • Weidong Li
چکیده

Process planning that is based on environmental consciousness and energy-efficient scheduling currently plays a critical role in sustainable manufacturing processes. Despite their interrelationship, these two topics have often been considered to be independent of each other. It therefore would be beneficial to integrate process planning and scheduling for an integrated energy-efficient optimisation of product design and manufacturing in a sustainable manufacturing system. This article proposes an energy-aware mathematical model for job shops that integrates process planning and scheduling. First, a mixed integrated programming model with performance indicators such as energy consumption and scheduling makespan is established to describe a multi-objective optimisation problem. Because the problem is strongly nondeterministic polynomial-time hard (NP-hard), a modified genetic algorithm is adopted to explore the optimal solution (Pareto solution) between energy consumption and makespan. Finally, case studies of energy-aware integrated process planning and scheduling are performed, and the proposed algorithm is compared with other methods. The approach is shown to generate interesting results and can be used to improve the energy efficiency of sustainable manufacturing processes at the process planning and scheduling levels.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

Integrated Scheduling of Manufacturing Operations and Material Handling Tasks in the Job Shops: a Network Model

Material handling tasks in the job shops have to be coordinated with manufacturing operations in order to efficiently utilize the production resources and to reduce the accumulation of work-in-process inventory. This paper extends the traditional job shop scheduling problem by incorporating the scheduling of the material handling tasks. It provides a generic definition and a network model for t...

متن کامل

Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach

Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...

متن کامل

Development and Simulation of Methods for Scheduling and Coordinating Decentralized Job Shops Using Multi-Computer Systems

This paper presents a new simulation methodology for scheduling and coordinating decentralized job shops using multi-computer systems. The parallel working subsystems of an integrated production system are distributed across a network of computers. Utilizing the special structure of parallel processor architectures new coordination and scheduling rules for job shops are designed and evaluated. ...

متن کامل

The application of computerized production control systems in job shop environments

Job shops are the most perplexing and challenging of environments for computerized scheduling systems. Some vendors call them problematic and avoid them whenever possible. The development of a generic scheduling tool that can be widely installed has eluded the many vendors who have tried. Installations in job shops are still painfully slow and are heavily customized. The wide variety of types o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014