Lead Time Reduction in an Integrated Inventory Model for Non-defective Items under a Supply Chain System

نویسندگان

  • M. Vijayashree
  • R. Uthayakumar
چکیده

A supply Chain (SC) with single vendor and single buyer is considered. In this research is presents lead time reduction system in an integrated inventory model for non-defective items in order to minimizing the sum of the ordering cost/setup cost, holding cost, transportation cost, production cost and lead time crashing cost of simultaneously optimizing the optimal order quantity, lead time and number of deliveries. The major role of this model is an efficient iterative algorithm has been developed to minimize the integrated total cost for the single vendor and the single buyer integrated system. Furthermore, a numerical example and sensitivity analysis is presented to illustrate the chief issues related to the proposed models. Lead time is a chief part in any inventory management system. In numerous realistic circumstances, lead time can be concentrated by a bonus crashing cost, that is, lead time is controllable. At this point, the buyer lead time can be reduced by paying a bonus crashing cost which is measured as a piecewise linear function. Graphical representation is also presented to illustrate the proposed model. Lastly, a statistical example will be offered to express the integrated inventory model and solution method and provide administrator a useful decision discussion. Sensitivity analyses are used to exemplify the decision-making insights of the model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items

In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...

متن کامل

A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...

متن کامل

Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System

The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...

متن کامل

An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply

The objective of this paper is to study an integrated two-supplier supply chain whose suppliers are unreliable. An unreliable supplier is alternative between available (ON) and unavailable (OFF) states which are considered to be independent exponential variables. The suppliers apply a continuous review policy and the retailer uses an adapted continuous review base on an(R,Q) policy. Transportat...

متن کامل

Introducing the Time Value of Money in a Non-consignment Vendor Managed Inventory Model

Vendor managed inventory (VMI) is an integrated approach for buyer–vendor coordination, according to which the vendor (supplier or manufacturer) decides on the appropriate buyer’s (retailer’s) inventory levels. The time value of money has not traditionally been considered in evaluating VMI supply chain’s total inventory cost in any studies up to now. Therefore, in the present study a new model ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017