A Method to Facilitate Uncertainty Analysis in LCAs of Buildings

نویسندگان

  • Francesco Pomponi
  • Alice M. Moncaster
چکیده

Life cycle assessment (LCA) is increasingly becoming a common technique to assess the embodied energy and carbon of buildings and their components over their life cycle. However, the vast majority of existing LCAs result in very definite, deterministic values which carry a false sense of certainty and can mislead decisions and judgments. This article tackles the lack of uncertainty analysis in LCAs of buildings by addressing the main causes for not undertaking this important activity. The research uses primary data for embodied energy collected from European manufacturers as a starting point. Such robust datasets are used as inputs for the stochastic modelling of uncertainty through Monte Carlo algorithms. Several groups of random samplings between 101 and 107 are tested under two scenarios: data are normally distributed (empirically verified) and data are uniformly distributed. Results show that the hypothesis on the data no longer influences the results after a high enough number of random samplings (104). This finding holds true both in terms of mean values and standard deviations and is also independent of the size of the life cycle inventory (LCI): it occurs in both large and small datasets. Findings from this research facilitate uncertainty analysis in LCA. By reducing significantly the amount of data necessary to infer information about uncertainty, a more widespread inclusion of uncertainty analysis in LCA can be encouraged in assessments from practitioners and academics alike.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A novel risk-based analysis for the production system under epistemic uncertainty

Risk analysis of production system, while the actual and appropriate data is not available, will cause wrong system parameters prediction and wrong decision making. In uncertainty condition, there are no appropriate measures for decision making. In epistemic uncertainty, we are confronted by the lack of data. Therefore, in calculating the system risk, we encounter vagueness that we have to use ...

متن کامل

COMPARISON OF RELIABILITY BASED AND DISPLACEMENT BASED OPTIMIZATION OF TUNED MASS DAMPERS REGARDING UNCERTAINTY

Some structural control systems have been devised to protect structures against earthquakes, which the tuned mass damper (TMD) being one of the earliest. The effect of a tuned mass damper depends on its properties, such as mass, damping coefficient, and stiffness. The parameters of tuned mass dampers need to be tuned based on the main system and applied load. In most of the papers, the paramete...

متن کامل

Prioritizing the equipment for making smart buildings with passive defense approach

Background and Aim: Since buildings are constantly exposed to threats, it is necessary that they be fully prepared to confront with all threats and their damages. Therefore, using the passive defense basics and principles in designing and constructing the buildings are considered obvious and undeniable. To prevent or reduce disasters caused by flood, earthquake, and war and so on, solutions suc...

متن کامل

FORM FINDING FOR RECTILINEAR ORTHOGONAL BUILDINGS THROUGH CHARGED SYSTEM SEARCH ALGORITHM

Preliminary layout design of buildings has a substantial effect on the ultimate design of structural components and accordingly influences the construction cost. Exploring structurally efficient forms and shapes during the conceptual design stage of a project can also facilitate the optimum integrated design of buildings. This paper presents an automated method of determining column layout desi...

متن کامل

Analysis of non-connected piled raft foundations (NCPRF) with cushion by finite element method

For the optimum design of Piled Raft Foundations (PRF), the concept of settlement reducer piles has been applied. However, when these piles are connected to the raft, a high stress may develop in the relatively small number of piles. Therefore, an alternative approach is to disconnect the piles from the raft forming a new system called a non-connected or disconnected piled-raft foundation (NCPR...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017