Pricing and production lot-size/scheduling with finite capacity for a deteriorating item over a finite horizon

نویسندگان

  • Jen-Ming Chen
  • Liang-Tu Chen
چکیده

Although the lately evolved manufacturing technologies such as enterprise resource planning (ERP) provide a uni&ed platform for managing and integrating core business processes within a &rm, the decision-making between marketing and production planning still remains rather disjoint. It is due in large parts to the inherent weaknesses of ERP such as the &xed and static parameter settings and uncapacitated assumption. To rectify these drawbacks, we propose a decision model that solves optimally the production lot-size/scheduling problem taking into account the dynamic aspects of customer’s demand as well as the restriction of &nite capacity in a plant. More speci&cally, we consider a single product that is subject to continuous decay, faces a price-dependent and time-varying demand, and time-varying deteriorating rate, production rate, and variable production cost, with the objective of maximizing the pro&t stream over multi-period planning horizon. We propose both coordinated and decentralized decision-making policies that drive the solution of the multivariate maximization problem. Both policies are formulated as dynamic programming models and solved by numerical search techniques. In our numerical experiments, the solution procedure is demonstrated, comparative study is conducted, and sensitivity analysis is carried out with respect to major parameters. The numerical result shows that the solution generated by the coordinated policy outperforms that by the decentralized policy in maximizing net pro&t and many other quanti&able measures such as minimizing inventory investment and storage capacity. Scope and purpose We consider a manufacturing &rm who produces and sells a single product that is subjected to continuous decay over a lifetime, faces a price-dependent and time-varying demand function, shortages are allowed and a completely backlogged, and has the objective of determining price and production lot-size/scheduling so as to maximize the total pro&t stream over multi-period planning horizon. We develop a tactical-level decision model that solves the production scheduling problem taking into account the dynamic nature of customer’s demand which is partially controllable through pricing schemes. As analogous to the sales and operations planning, the proposed scheme can be used as a coordination center of the APS system within a generic enterprise resource planning framework which integrates and coordinates distinct functions within a &rm. ∗ Corresponding author. Tel.: +886-03-425-8192; fax: +886-3-425-8197. E-mail address: [email protected] (J.-M. Chen). 0305-0548/$ see front matter ? 2004 Elsevier Ltd. All rights reserved. doi:10.1016/j.cor.2004.04.005 2802 J.-M. Chen, L.-T. Chen / Computers & Operations Research 32 (2005) 2801–2819 This paper diBers from the existing works in several ways. First, we propose a dynamic version of the joint pricing and lot-size/scheduling problem taking into account the capacitated constraint. Second, several key factors being considered in the model, such as the demand rate, deteriorating rate, production rate, and variable production cost are assumed time-varying that reDect the dynamic nature of the market and the learning eBect of the production system. A third diBerence between the past research and ours is that the price can be adjusted upward or downward in our model, making the proposed pricing policy more responsive to the structural change in demand or supply. ? 2004 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-warehouse system for non-instantaneous deterioration products with promotional effort and inflation over a finite time horizon

In the current global market, organizations use many promotional tools to increase their sales. One such tool is sales teams’ initiatives or promotional policies, i.e., free gifts, discounts, packaging, etc. This phenomenon motivates the retailer/or buyer to order a large inventory lot so as to take full benefit of promotional policies. In view of this the present paper considers a two-warehous...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

Optimal pricing and replenishment policies for instantaneous deteriorating items with backlogging and trade credit under inflation

In this paper we develop an economic order quantity model to investigate the optimal replenishment policies for instantaneous deteriorating items under inflation and trade credit. Demand rate is a linear function of selling price and decreases negative exponentially with time over a finite planning horizon. Shortages are allowed and partially backlogged. Under these conditions, we model the ret...

متن کامل

Tabu Search for a Discrete Lot Sizing and Scheduling Problem

In this paper we consider a multi-item, multi-machine discrete lot sizing and scheduling problems (DLSP) which consists of finding a minimal cost production schedule over a finite discrete horizon, where in each period a machine may be either producing one item at full capacity or is idle. The demand for each item in each period is known, and can be satisfied either by production in the period,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 32  شماره 

صفحات  -

تاریخ انتشار 2005