Tour scheduling for part-time employee with variable productivity

نویسنده

  • Mohammad Akbari Arekamari
چکیده

Overall goal of our research is to incorporate human factors engineering into scheduling theory in order to exploit optimized human performance. Tour scheduling problem in which part-time employees have variable performance have been studied in this paper. Our model objective function is minimization of costs of staffing and tries to determine the best shift duration and employees assignment in shifts. The unique characteristic of this study is consideration of ergonomic aspect (fatigue rate of employees) in tour scheduling problem. We used genetic algorithm to conquest difficulty of our model and to find desirable solution in a reasonable running time. In order to show effectiveness and efficiency of our model we generated sets of test problems with different sizes. Using LINGO, we examined the performance of genetic algorithm for a variety of instances. The comparison results demonstrated satisfactory performance of genetic algorithm in terms of computational time and quality of solutions.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-objective Solution Approaches for Employee Shift Scheduling Problems in Service Sectors (RESEARCH NOTE)

Today, workforce scheduling programs are being implemented in many production and service centers. These sectors can provide better quality products and/or services to their customers, taking into account employees’ desires and preferences in order to increase sector productivity. In this study, an employee shift scheduling problem in the service sector is discussed. In the problem, the aim is ...

متن کامل

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

Tour Scheduling with Skill Based Costs

We present a new formulation of the tour scheduling problem with assignment costs that are a function of employee capabilities. The objective also incorporates a quadratic term to encourage compact shifts and equal interday shift lengths for each employee. The problem is solved using a tabu-like probabilistic local search algorithm. The algorithm is applied in two phases with employee conflicts...

متن کامل

A Comparison of Heuristics for Assigning Individual Employees to Labor Tour Schedules

The labor tour scheduling literature has focused on the development of schedules, and with a few exceptions, employees were assumed to have identical cost and productivity. Even the few exceptions in the literature that solved tour problems considered employees within a work group to have identical cost and productivity. In this paper we evaluated heuristics for assigning individual employees –...

متن کامل

1 A Bivariate Multinomial Probit Model for Trip Scheduling : Bayesian Analysis of

36 37 As tour-based methods for activity and travel participation patterns replaces trip-based methods, time-38 of-day (TOD) choice modeling remains problematic. In practice, most travel demand model systems 39 handle tour scheduling via joint-choice multinomial logit (MNL) models, which suffer from the well-40 known independence of irrelevant alternatives (IIA) assumption. This paper introduce...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • IJAOM

دوره 8  شماره 

صفحات  -

تاریخ انتشار 2016