Path Construction and Visit Scheduling for Targets using Data Mules

نویسندگان

  • Chih-Yung Chang
  • Gwo-Jong Yu
  • Tzu-Lin Wang
  • Chih-Yu Lin
چکیده

This paper considers the target patrolling problem which asks a set of mobile data collectors (or data mules) to efficiently patrol a set of given targets. Since the time interval (also referred to visiting interval) for consecutive visits to each target reflects the monitoring quality of this target, the goal of this research is to balance the visiting interval of each target. This paper firstly proposes a Basic Target Points Patrolling (B-TPP) algorithm which aims at constructing an efficient patrolling route for a number of given data mules such that the visiting intervals of all target points can be stable. For the scenario containing weighted target points, a Weighted TPP (W-TPP) algorithm is further proposed to satisfy the demand that targets with higher weights have higher data collection frequencies. By considering the energy constraint of each data mule, this paper additionally proposes a W-TPP with Recharge (RW-TPP) algorithm which treats energy recharge station as a weighted target and arranges the data mules visiting the recharge station before exhausting their energies. Performance study demonstrates that the proposed algorithms outperform existing approaches in terms of, average visiting frequency, movement distance of DM, average quality of monitoring satisfaction rate, and efficiency index. Keywords—WSNs; Mobile data collectors; Disconnected targets; Weighted target; Recharge station

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

Exact and Approximation Algorithms for Data Mule Scheduling in a Sensor Network

We consider the fundamental problem of scheduling data mules for managing a wireless sensor network. A data mule tours around a sensor network and can help with network maintenance such as data collection and battery recharging/replacement. We assume that each sensor has a fixed data generation rate and a capacity (upper bound on storage size). If the data mule arrives after the storage capacit...

متن کامل

Data Gathering from Path Constrained Mobile Sensors Using Data MULE

In Wireless Sensor Network (WSN) sensor nodes are deployed to sense useful data from environment. Sensors are energy-constrained devices. To prolong the sensor network lifetime, now a days mobile robots (sometimes refer as data sink, data mules, or data collectors) are used for collecting the sensed data from the sensors. In this environment sensor nodes directly transfer their sensed data to t...

متن کامل

Performance assessment of appointment system in managing outpatients’ waiting time in a general hospital: A Case study

Background: Appointment scheduling system is a critical component in controlling patients’ waiting time, so can increase the efficiency and timely access to health services. It is also an important determinant of patient satisfaction. The aim of this study was to assess the relationship of using a scheduling system and outpatients’ waiting time in a general teaching hospital in Tehran, Iran. M...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013