A Multi-mode RCPSP with Stochastic Nonrenewable Resource Consumption

نویسندگان

  • Laurent Flint Muller
  • Laurent Flindt Muller
چکیده

Many processes within production scheduling and project management involve the scheduling of a number of activities, each activity having a certain duration and requiring a certain amount of limited resources. The duration and resource requirements of activities are commonly the result of estimations, and thus generally subject to uncertainty. If this uncertainty is not taken into account the resulting schedules may not be robust in the sense that, when executed, the uncertainty may cause the schedules to take longer than expected, consume more resources, or be outright infeasible. We propose a new variant of the Multi-mode ResourceConstrained Project Scheduling Problem, where the nonrenewable resource requirements of each mode is given by a Gaussian distribution, and the nonrenewable resource constraints must be satisfied with a certain probability . Such constraints are also known as chance constraints. We present a Conic Quadratic Integer Program model of the problem, and describe and experiment with a branch-and-cut algorithm for solving the problem. In each node of the branch-and-bound tree, the branching decisions are propagated in order to remove variables from the problem, and thus improve bounds. In addition we experiment with cutting on the conic quadratic resource constraints. Computational experiments show that the branch-andcut algorithm outperforms CPLEX 12.1. We finally examine the “cost of uncertainty” by investigating the relation between values of , the makespan, and the solution time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints

a r t i c l e i n f o Keywords: Multi-mode scheduling Ant colony optimization Renewable and nonrenewable resource constraints Construction projects An ant colony optimization (ACO)-based methodology for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) considering both renewable and nonrenewable resources is presented. With regard to the MRCPSP solution consisting ...

متن کامل

AN EXPERIMENTAL INVESTIGATION OF THE SOUNDS OF SILENCE METAHEURISTIC FOR THE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH PRE-OPTIMIZED REPERTOIRE ON THE HARDEST MMLIB+ SET

This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...

متن کامل

Recent Developments of Computational Intelligence for Resource Constrained Project Scheduling Problems: A Taxonomy and Review

This article presents a broad overview of applications of Computational Intelligence (CI) paradigms in resource constrained project scheduling problems (RCPSP) including Fuzzy system (FS), Artificial Neural Networks (ANN), Particle Swarm Optimization (PSO), Tabu Search (TS), Genetic Algorithms (GA), Simulated Annealing (SA) and other metaheuristics techniques. Recent developments of computation...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016