Accelerating Products under Due-date Oriented Dispatching Rules in Semiconductor Manufacturing
نویسندگان
چکیده
In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. In this paper, we study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the considered factory, its load, and the accelerated product. As a consequence, it will be hard for production planners to find simple rules of thumb for the effects of accelerating products. In general, detailed simulation experiments will be required.
منابع مشابه
Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing
In this study we compare the cycle-time and on-time-delivery performance of the Critical Ratio (CR), the Earliest Due Date (EDD), and the Operation Due Date (ODD) dispatching rules in semiconductor wafer manufacturing. In addition, we comment on the robustness of the rules to low target flow factor values. It turns out that EDD has almost no positive effect on on-time delivery compared to First...
متن کاملDue-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility
This paper focuses on lot release control and scheduling problems in a semiconductor wafer fab producing multiple products that have different due dates and different process flows. For lot release control, it is necessary to determine the type of a wafer lot and the time to release wafers into the wafer fab, while it is necessary to determine sequences of processing waiting lots in front of wo...
متن کاملRule-based scheduling in wafer fabrication with due date-based objectives
Wafer fabrication is a capital-intensive and highly complex manufacturing process. In the wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers to improve production efficiency and meet customers’ requirements of on-time delivery. In this research we propose a dispatc...
متن کاملComparison of Dispatching Rules for Semicondutor Manufacturing Using Large Facility Models
In this paper, we present a comparison of five dispatching rules that aim to reduce the mean and the variance of cycle times. The performance of the dispatch rules is evaluated using simulation results for two large semiconductor wafer fabrication facilities. The results show that which dispatch rule achieves the best results depends on the fab, on the load of the fab and on the product.
متن کاملDynamic Scheduling of a Semiconductor Production Line Based on a Composite Rule Set
Various factors and constraints should be considered when developing a manufacturing production schedule, and such a schedule is often based on rules. This paper develops a composite dispatching rule based on heuristic rules that comprehensively consider various factors in a semiconductor production line. The composite rule is obtained by exploring various states of a semiconductor production l...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003