Analysis of Coupled Bunch Instabilities in Bessy-vsr
نویسندگان
چکیده
BESSY-VSR, a scheme where 1.5 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed [1]. The strong longitudinal bunch focusing is achieved by superconducting high gradient RF cavities. This paper presents investigations of coupled bunch instabilities driven by HOMs of superconducting multi-cell cavities in BESSY-VSR. Analytical calculations and tracking simulations in time domain are performed in the longitudinal and the transverse planes and factors that influence the threshold currents are being discussed. Suitable candidates of cavities which are presently available or in the phase of design are compared with respect to their instability thresholds.
منابع مشابه
Influence of Transient Beam Loading on the Longitudinal Beam Dynamics at Bessy Vsr
BESSY VSR, a scheme where 1.7 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed [1]. The strong longitudinal bunch focusing is achieved by superconducting high gradient RF cavities. If the bunch fill pattern exhibits a significant inhomogeneity, e.g. due to gaps, transient beam loading causes a distortion of the longitudinal pha...
متن کاملStatus and Prospects of the Bessy Ii Injector System
The BESSY II injector system consists of a 50MeV Linac, installed in preparation for TopUp operation, and a fastramping Booster synchrotron. The system provides injection efficiencies into the BESSY II Storage Ring well above 90%. This contribution reports on the present status, measurements of energy acceptance as well as studies on coupled bunch-by-bunch instability. Requirements for BESSY VS...
متن کاملBessy Ii Feedback Systems
The present status of feedback systems to counteract unwanted beam motion and coupled-bunch beam instabilities in the BESSY II storage ring is reviewed.
متن کاملOrbit Measurements at the Bessy Ii Booster in Preparation for Quasi-low Alpha Operation
Diagnostic refurbishments are ongoing at the booster synchrotron in preparation for the near future Variable pulse Storage Ring (VSR) project at BESSY II. Essential orbit measurements have been re-installed after almost two decades of latency. This diagnostic will help assess the effectiveness of possible upgrade scenarios such as quasi-low alpha operation and extraction optimization. The contr...
متن کاملElectron Beam Probe Diagnostic for BESSY II Storage Ring
A low energy electron beam can be used to characterize the high energy ultra-relativistic bunches. This technique allows one to obtain the bunch transverse profiles as well as the bunch length within a non-destructive single shot measurement. In this paper the bunch length measurement technique based on the interaction of the low energy electron beam with an ultra-relativistic bunch is describe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014