Economic Lot Scheduling under Performance Decay

نویسندگان

  • Alessandro Alle
  • Jose M. Pinto
  • Lazaros G. Papageorgiou
چکیده

The aim of this work is to propose a mathematical programming model for the Economic Lot Scheduling Problem (ELSP) with performance decay. The main difficulties related to this model are the nonlinearities and/or nonconvexities associated with the dynamic behavior of the system with time. Firstly, the problem is formulated as a Mixed Integer Non Linear Program (MINLP), which is found to be nonconvex. The model is then transformed into a Mixed Integer Linear Programming (MILP) model through the discretization of cycle time. Therefore, the globally optimal schedule can be obtained. A case study demonstrates the applicability of the MILP model and its potential benefits in comparison with a hierarchical approach.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Using the Simple Fixed Rate Approach to Solve Economic Lot Scheduling Problem under the Basic Period Approach

The Economic Lot Scheduling Problem (ELSP) is a valuable mathematical model that can support decision-makers to make scheduling decisions. The basic period approach is effective for solving the ELSP. The assumption for applying the basic period approach is that a product must use its maximum production rate to be produced. However, a product can lower its production rate to reduce the average t...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

An Improved Heuristic for Solving the Eco- Nomic Lot Scheduling Problem in Flow Shops under Power-of-two Policy

This paper proposes a new heuristic for solving the economic lot scheduling problem in flow shops under the Power-of-Two policy. A review of relevant literature shows that the heuristic in Ouenniche and Boctor [15] not only solves this problem with the best objective function value among the existing solution approaches, but also generates a feasible production schedule. However there are sever...

متن کامل

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002