Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties

نویسندگان

  • Cao Vinh Le
  • Chee Khiang Pang
چکیده

Motivated by the need to deal with uncertainties in energy optimization of flexible manufacturing systems, this paper considers a dynamic scheduling problem which minimizes the sum of energy cost and tardiness penalty under power consumption uncertainties. An integrated control and scheduling framework is proposed including two modules, namely, an augmented discrete event control (ADEC) and a max-throughput-min-energy reactive scheduling model (MTME). The ADEC is in charge of inhibiting jobs which may lead to deadlocks, and sequencing active jobs and resources. The MTME ensures the fulfillment of the innate constraints and decides the local optimal schedule of active jobs and resources. Our proposed framework is applied to an industrial stamping system with power consumption uncertainties formulated using three different probability distributions. The obtained schedules are compared with three dispatching rules and two rescheduling approaches. Our experiment results verify that MTME outperforms three dispatching rules in terms of deviation from Pareto optimality and reduces interrupted time significantly as compared to rescheduling approaches. In addition, ADEC and MTME are programmed using the same matrix language, providing easy implementation for industrial practitioners. 2013 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A hybrid GRASP algorithm for minimizing total weighted resource tardiness penalty costs in scheduling of project networks

In this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. In this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. In other words, there is a dictated ready date as well as a d...

متن کامل

Particle Swarm Optimization for Scheduling to Minimize Tardiness Penalty and Power Cost

Traditional research on machine scheduling focuses on job allocation and sequencing to optimize certain objective functions that are defined in job completion times. With regard to environmental concerns, energy consumption becomes another critical concern in high-performance systems. In this paper, we address the scheduling problem in a multiple machine system where the computing speeds of the...

متن کامل

An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem

In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardiness penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness-tard...

متن کامل

Cost and Environmental Pollution Reduction Based on Scheduling of Power Plants and Plug-in Hybrid Electric Vehicles

There has been a global effort to reduce the amount of greenhouse gas emissions. In an electric resource scheduling, emission dispatch and load economic dispatch problems should be considered. Using renewable energy resources (RESs), especially wind and solar, can be effective in cutting back emissions associated with power system. Further, the application of electric vehicles (EV) capable of b...

متن کامل

Single-Machine Scheduling with Upper Bounded Maintenance Time under the Deteriorating Effect

We consider a single-machine scheduling problem with upper bounded actual processing time and upper bounded maintenance time under deteriorating effect.The actual processing time of a job is a position-dependent power function. If the actual processing time of a job exceeds the upper bound, tardiness penalty of the job should be paid. And if the maintenance time exceeds the corresponding upper ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 66  شماره 

صفحات  -

تاریخ انتشار 2013